Laserfiche WebLink
<br />f . ~ t to" <br />,- . <br /> <br />.r <br />, <br /> <br />Time for Como let ion: <br /> <br />The time for completion of the Value Engineering Technical. Review and existing <br />Pavement Survey Study and Report is 60 days from the approval of this proposal. ' <br /> <br />Fee Prooosal: <br /> <br />The Cost Proposal for the described scope of services and deliverables is: <br /> <br />Project Manager, 24 hours @ $ 110.00 Ihour $ <br />Senior Engineer, 80 hours @ $ 110.00 /hour $ <br />Drainage Engineer, 200 hours @ $ 90.00 /hour $ <br />Electro Mechanical Engineer, 16 hours@ $ 100.00 /hour $ <br />Sub - TOTAL $ <br /> <br />Sub-contract for Geotechnical work:- <br />Pavement core sampling. 30 samples @ $ 20.00 <br />Hydraulic conductivity of the soil tests. 10 @ $ 500.00 <br />Sub - TOTAL <br /> <br />TOTAL <br /> <br />Total: Thirty Six Thousand Six Hundred Forty and.00/100 <br /> <br />....Sub-contract work will be authorized by the City. ' <br /> <br />2,640.00 <br />8.800.00 <br />18,000.00 <br />1.600.00 <br />31,040.00 <br /> <br />$ <br />$ <br />$ <br /> <br />600.00 <br />5.000.00 <br />5,600.00 <br /> <br />.36.640.00 <br /> <br />s <br /> <br />Should you have any questions please call me at (305) 944-5151, Ext. 367 <br /> <br />Sincerely, <br /> <br />BEISWENGER, HOCH AND ASSOCIATES INC. <br /> <br /> <br />Victor H. Guevara <br />Project Manager <br /> <br />cc: Robert Deuser <br /> <br />BeIswenger, Hoch and Aaaocla....lnc. <br />