Laserfiche WebLink
<br />C.- Fee for Phase II, Final Drainage Design proposal <br /> <br />1.0 The consulting engineering fee for the Phase II scope of services is: <br /> <br />1.1 Topographical Survey <br /> <br />. Survey work, three men crew. 10 party days <br />. Survey Data Processing 80 hrs X $ 85/hr <br /> <br />8,000.00 <br />6.800.00 <br /> <br />14,800.00 <br /> <br />TOTAL <br /> <br />$ <br /> <br />1.2 Geometric and Drainage Design <br /> <br />. Project Manager <br />. Senior Design Engineer <br />. Design Engineer <br />. CADD Operator <br />. Permits (DERM, etc) <br />. Specifications & Misc. <br /> <br />120 hrs X $ 120 /hr. <br />560 hrs X $ 110 /hr <br />280 hrs X $ 90 /hr <br />160 hrs X $ 65/hr <br />120 hrs X $ 110 /hr <br />80 hrs X $ 90/hr <br /> <br />14,400.00 <br />61,600.00 <br />25,200.00 <br />10,400.00 <br />13,200.00 <br />7.200.00 <br /> <br />$ 132,000.00 <br /> <br />TOTAL <br /> <br />D.- Fee for Phase III Technical Assistance for Bidding <br /> <br />. Project Manager 80 hrs X 120 /hr <br />. Design Engineer 40 hrs X 90 /hr <br />. Meetings and Conferences 24 hrs X 110 /hr <br />. Review Documentation 40 hrs X 110 /hr <br /> <br />9,600.00 <br />3,600.00 <br />2,640.00 <br />4.400.00 <br /> <br />$ 20,240.00 <br /> <br />TOTAL <br /> <br />O-e <br /> <br />14,800-+ <br />132,000-+ <br />20,240-+ <br /> <br />= <br /> <br />167,C40-00* <br /> <br />Beiswenger, Hoch and Associates, Inc. <br />