My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-635
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:10 AM
Creation date
1/25/2006 1:57:32 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-635
Date (mm/dd/yyyy)
02/19/2004
Description
– Agmt w/Miller, Legg & Assoc., Redesign Active Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 13. <br /> <br />Task 14. <br /> <br />Task 15. <br /> <br />well injection system. Engineering permit applications, <br />plans, and support data shall be prepared for submittal to <br />the South Florida Water Management District (SFWMD), <br />Miami-Dade County, DERM, the Florida Department of <br />Environmental Protection (FDEP), and the City of Sunny <br />Isles for approval and/or informational purposes as <br />appropriate. <br /> <br />FEE: Lump Sum of $3,640. <br /> <br />NOTE: The fee for this phase does not include <br />environmental services associated with the SFWMD <br />permitting process. <br /> <br />On-Site Engineering Revisions - Consultant shall revise <br />engineering plans and cross sections for on-site <br />improvements due to proposed modifications. Plan . <br />changes shall include paving, grading, storm drainage <br />system; water distribution system; and gravity sewage <br />collection system revisions. In addition, Consultant shall <br />coordinate changes as required by the Client, DERM and <br />WASD. <br /> <br />FEE: Lump Sum of $ 4,300. <br /> <br />Off-Site Drainage Coordination - Consultant shall <br />coordinate off-site drainage improvements with the Client <br />and BH&A Consulting Engineering. In addition, Consultant <br />shall prepare the on-site plans and cross sections to <br />address the off-site drainage coordination revisions and <br />include the applicable off-site drainage improvements with <br />the on-site engineering system. Revisions required by the <br />City upon review of the 50%, 90%, and 100% submittals <br />are included in this fee. <br /> <br />FEE: Lump Sum of $ 1,600. <br /> <br />Off-site Engineering Revisions - Consultant shall prepare <br />engineering plans and specifications for off-site <br />improvements as follows: Drop-off/on-street parking areas, <br />including drainage, grading and signing and marking <br />modifications, sidewalk improvements and pedestrian <br />walkway improvements. Engineering permit applications, <br />plans and support data shall be submitted to the City of <br />Sunny Isles Beach and Miami-Dade Highway Division for <br />approval. <br /> <br />FEE: Lump Sum of $2,300. <br /> <br />Page 7 of 11 <br /> <br />Initial: MLA:Mclient: <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.