My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-657
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:11 AM
Creation date
1/25/2006 1:57:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-657
Date (mm/dd/yyyy)
04/15/2004
Description
– Award Bid 04-01-01 B.K. Marine Construction, Seawall Repairs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MAR-1T-04 U~:4bAM rKVM-~lll vr ~unnl I~~~~ g~~vn <br /> <br />EXHmIT A <br /> <br />l <br /> <br />CITY OF SUNNY ISLES - SEAWAll REPLACEMENT & RESTORArlON <br />UNIT PRICE BID SCHEDULE <br /> <br />Item <br />No. Descri ion <br /> <br />Estimated <br />Quant <br /> <br />Unit <br /> <br />Unit Price <br /> <br />Estimated <br />Amount <br /> <br />1. Mobilization of Equipment and personnd <br />(Less than or equal to 10% of the toml bid) <br /> <br />1 <br /> <br />Lwnp <br /> <br />~~ 2ft ~$ $ J.~, 2- ~ 9 .00 <br /> <br />2. Restoration of Atlantic Ave. Seawall <br />(Replace cap &: tiebacks) <br /> <br />Lump <br /> <br />~ <br />$ "',/, ()If) .00 <br />, <br /> <br />$ b 9. 0 /0 .00 <br />, <br /> <br />3, Resroration of Atlantic Ave. aridge Revennent <br />(Install sheetpiJe toe wall, concrete footer. <br />replace concrere cap, install geotextiJe cloth. <br />backfill and re-sod) <br /> <br />Lump <br /> <br />$ '12. /8tf .00 <br />I <br /> <br />$ '12, J 8tf .00 <br />.. , <br /> <br />4. Replacement of 183"1 St. Seawall 1 <br />(In'ltall vertical & batter piles, cOncrete panels, <br />caSt in place concrere cap, install geOlexrlle <br />cloth. backfill. grade and re--sod) <br /> <br />Lump <br /> <br />$/41, 19/L.oo <br /> <br />$ /1)6. 79lJ .00 <br />. <br /> <br />5. Site cleanup and site re'ltoration at all three <br />locations. demobilization. <br /> <br />I <br /> <br />Lump <br /> <br />$ 5: {)CO.OO $. s: fJO 0 , .00 <br />.. ' <br /> <br />#'" cd; ~rflr ~TCIT;;tKCE~ ~ ~lfff;]g;1, .00 <br /> <br />Date Avltilable to begin work'r 1, ~o r.J <br /> <br />" The total ofJt~m Nos. 1,2, 3,4 and 5 for the r~toraIion and replacement of the above f1~nlioned seawalls is ~ <br />~~ ~ '1fJ.~hiJ- ~ AU~ ~ ~ dollars <br /> <br />and ~ _ cel1ts (in words). <br /> <br />, ~ ,x'. <br />Authoriz~d Signa ~~ /2---;( ~ <br /> <br /> <br />Date <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.