My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-657
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:11 AM
Creation date
1/25/2006 1:57:35 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-657
Date (mm/dd/yyyy)
04/15/2004
Description
– Award Bid 04-01-01 B.K. Marine Construction, Seawall Repairs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MAR-IT-04 09:48AM FROM-CITY OF SUNNY ISLES BEACH <br /> <br />+3059493113 <br /> <br />T-5611 r,I4111 r-14f <br /> <br />DOCUMENT 00403 <br />TRENCH SAFETY ACT <br />(90-96. Laws of Florida) <br /> <br />Bidder acknowledges that included in the appropriate bid items of the proposal and in the Total <br />Bid Price are costs for complying with the Florida Trench Safety Ad. (90-96, Laws of Florida) <br />effective October 1, 1990. The bidder further identifies the costs of such compliance to be <br />summarized below: /1/ ~ <br /> <br />Trench Safety <br />Measure <br />(Description) <br /> <br />Unit of <br />Measure <br />(LFSF) <br /> <br />Unit <br />(Quantity) <br /> <br />Unit <br />Cost <br /> <br />Extended <br />Cost <br /> <br />A. <br /> <br />B. <br />C. <br /> <br />D. <br /> <br />Total $ <br /> <br />If applicable, the Contractor certifies that all trench excavation done within his control in excess <br />of five feet in depth shall be in accordance with the Florida Department of Transportation's <br />Special Provisions Article 125-1 and Subarticle 125-4.1 (TRENCH EXCAVATION SAFETY <br />SYSTEM AND SHORING, SPECIAL - TRENCH EXCAVATION). <br /> <br />Failure to complete the above may result in the bid being declared non-responsive. <br />Contractor agrees that the above safety compliances and <br /> <br />END OF DOC <br /> <br /> <br />03/03 <br /> <br />00403-1 <br /> <br />03-4122 <br /> <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.