Laserfiche WebLink
<br />SECTION 17725 <br /> <br />CCTV VIDEO SYSTEM <br /> <br />PART 1 GENERAL <br /> <br />1,1, SCOPE <br /> <br />A. This section of the specifications requires the complete installation of the system as indicated <br />on the drawings and/or specified herein. <br /> <br />B. Furnish, install, and deliver materials required to make the systems complete and of <br />professional quality, including any miscellaneous items necessary for proper operation, but not <br />specifically mentioned, Provide all labor and supervision to check out, adjust and calibrate total <br />system, The only exemptions are items specifically listed as "work by others". <br /> <br />C. Confirm voltage and frequency of systems and components and match with facility power <br />distribution system, Confirm all electrical standards for the country of concern to be acceptable. <br />This includes US standards organizations such as EIA (Electronic Industries Association) or <br />International standards bodies such as CCIR (International Radio Consultative Committee), <br /> <br />1.2, PREFABRICATION INSTALLATION MEETINGS <br /> <br />A. Prior to fabrication and system(s) installation, coordinate with the Architect and Owner to insure <br />system(s) work with building components, specifically including, but not limited to, the building <br />fire management system. <br /> <br />B, Verify all site conditions prior to installation, and coordinate work with the Architect and Owner <br />to assure a timely installation. The Security System Installer shall abide by any and all local <br />codes, manufacturers recommendations, safe work practices and shall secure any or all <br />applicable permits or licenses to complete said work. <br /> <br />1,3, SUBMITTALS <br /> <br />A. Submit for approval, within 30 days of award of contract or as required by Owner's schedule, but <br />prior to purchase or fabrication of equipment, 5 copies of the following: <br /> <br />1, A complete equipment list, with model numbers, manufacturers, quantities, and <br />specification .cut" sheets of all equipment used, broken down by system. <br /> <br />2. Equipment layout drawings for each room, with model numbers, <br /> <br />3, Proposed construction details for any custom built equipment. Drawings of custom panels <br />and labeling. Include proposed labels and layouts for switch panels, pictorial panels, and <br />receptacle plates, <br /> <br />4. Total systems block diagrams broken down by system, Drawings should include proposed <br />terminal block numbers, cable types and sizes, device location, labeling, and wiring <br />diagrams for proposed switching systems and custom electronics. <br /> <br />5. Provide any revision to the Contract drawings, showing any relocation of devices, cabling, or <br />circuiting that may be warranted. <br /> <br />6. Warranty statement with proper dates filled in at the time of final acceptance, <br /> <br />8/04 <br /> <br />17725-1 <br /> <br />SIB <br />