Laserfiche WebLink
<br /> <br />Golden Shores Entrance Wall <br /> <br />UNIT PRICE BID SCHEDULE <br /> <br />Item <br />No. Description <br />I. GENERAL <br /> <br />1 Furnish and Install eight-foot (8') high Pre-Cast <br />Concrete Barrier Wall including coping and <br />caps. <br />2 Furnish and Install coping on existing barrier <br />wall <br />3 Remove and dispose of chain-link fence <br /> <br />Estimated <br />Quantity Unit <br /> <br />517 LF $ <br /> <br />920 LF $ <br /> <br />517 LF <br /> <br />SUBTOTAL GENERAL <br /> <br />3 Mobilization and Demobilization of all <br />equipment and personnel (10% of Subtotal) <br />4 Having examined the place of the work and all <br />matters referred to in the Instructions to Bidders <br />and the Contract Documents prepared by <br />Calvin-Giordano and Associates, Inc., the <br />Engineer for the above referenced project, we, <br />the undersigned, hereby offer to enter into a <br />Contract to perform the work of the base <br />contract for the Lump Sum Price which <br />includes the entire project as shown on the <br />plans and described in the specifications. <br /> <br />Unit Price <br /> <br />Estimated Amount <br /> <br />, 9~ <br /> <br />'S- <br />30 <br /> <br />$ \0 l. 3"6 <br />sq'6<t>o <br /> <br />\55\0 <br />\,\ (1.6 <br /> <br />$ <br /> <br />$ <br /> <br />$ <br /> <br />LS $ ,"\ \ (!) 0 $ \ \ \ ~ 0 <br /> <br />LS $ $ <br /> <br />GRAND TOTAL GENERAL $ \ q '5 31 6. 0 t <br />o N IF -h \J ~ () rL bO 'A ~ 't'\ t f " '( e"11f{) v $fWD ---r'Kve..e h \I "'~ R6J) <br />'8tV[Nf-Y <:s,'rA.;{Oo ((b> <br /> <br /> <br /> <br />[^J~'R <br /> <br />12/04 <br /> <br />00300-2 <br /> <br />~ ~--4. <br /> <br />(}'- ~a tLo~S <br /> <br />04-4801 <br />