My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-770
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 11:58:31 AM
Creation date
1/25/2006 1:57:50 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-770
Date (mm/dd/yyyy)
02/10/2005
Description
– Award Bid #04-12-02 Agmt w/Tenex Enter. for Golden Shores Entrance Wall.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~{~ <br />.... <br />.. <br />. <br /> <br />~1t <br /> <br />. <br />I <br /> <br />DOCUMENT 00403 <br /> <br />TRENCH SAFETY ACT <br /> <br />(90-96, Laws of Florida) <br /> <br />Bidder acknowledges that included in the appropriate bid items of the proposal and in the Total Bid Price <br />are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida) effective October 1, <br />1990. The bidder further identifies the costs of such compliance to be summarized below: <br /> <br />Trench Safety <br />Measure <br />(Description) <br /> <br />Unit of <br />Measure <br />(LFSF) <br /> <br />Unit <br />(Quantity) <br /> <br />Unit <br />Cost <br /> <br />Extended <br />Cost <br /> <br />A. <br />B. <br />C. <br />D. <br /> <br />/\/1/1 <br /> <br />Total $__ tf - <br /> <br />If applicable, the Contractor certifies that all trench excavation done within his control in excess of five <br />feet in depth shall be in accordance with the Florida Department of Transportation's Special Provisions <br />Article 125-1 and Subarticle 125-4.1 (TRENCH EXCAVATION SAFETY SYSTEM AND <br />SHORING, SPECIAL - TRENCH EXCAVATION). <br /> <br />Failure to complete the above may result in the bid being declared non-responsive. <br /> <br />Contractor agrees that the above safety compliances and costs are included in his bid package. <br /> <br />12/04 <br /> <br />\~- ~ <br /> <br />Signature of Bidding Contractor <br /> <br />END OF DOCUMENT <br /> <br />00403-1 <br /> <br />04-4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.