Laserfiche WebLink
<br />the CONTRACTOR shall notify the CITY immediately, Lack of such notice to the CITY will be construed as <br />acceptance by the CONTRACTOR ofthe status of the Work of other CONTRACTORS as being satisfactory for proper <br />coordination of their own Work, <br /> <br />7,9 The cost of extra Work resulting from lack of notices, untimely notices, failure to respond to notices, defective <br />Work or lack of coordination shall be borne by the CONTRACTOR responsible for such lack of notices, etc, <br /> <br />ARTICLE 8 - CITY'S RESPONSIBILITIES <br /> <br />8,1 The CITY will issue all communications to the CONTRACTOR, <br /> <br />8,2 The CITY will furnish the data required of them under the Contract Documents promptly, <br /> <br />8,3 The CITY'S duties in respect to providing lands and easements are set forth in Paragraphs 4,1 and 4,2, <br /> <br />8.4 The CITY shall have the right to take possession of and use any completed or partially completed portions of the <br />Work, notwithstanding the fact that the time for completing the entire Work or any portion thereof may not have expired; <br />but such taking possession and use shall not be deemed an acceptance of any Work not completed in accordance with <br />the Contract Documents, <br /> <br />ARTICLE 9 - CITY'S STATUS DURING CONSTRUCTION <br /> <br />Measurement of Ouantities: <br /> <br />9,1 All Work completed under the Contract will be measured by the CITY according to the United States Standard <br />Measures, All linear surface measurements will be made horizontally or vertically as required by the item measured, <br /> <br />Reiecting Defective Work: <br /> <br />9,2 The CITY will have authority to disapprove or reject Work which is "defective" (which term is hereinafter used <br />to describe Work that is unsatisfactory, faulty or defective, or does not conform to the requirements of the Contract <br />Documents or does not meet the requirements of any inspection, test or approval referred to in Special Condition, or has <br />been damaged prior to fInal acceptance), They will also have authority to require special inspection or testing of the <br />Work as provided in the Special Conditions whether or not the Work is fabricated, installed or completed, <br /> <br />Shop Drawings, Change Orders and Payments: <br /> <br />9,3 In connection with the CITY'S responsibility as to Shop Drawings and samples, see paragraphs 6,25 through 6,28, <br />inclusive, <br /> <br />9.4 In connection with the CITY'S responsibility for Change Orders, see Articles 10, II, and 12, <br /> <br />9,5 In connection with the CITY'S responsibilities in respect of Application of Payment, etc" see Article 14, <br /> <br />Resident Proiect Representative: <br /> <br />9,6 The CITY will provide construction observation sufficient to confirm to CITY and all applicable regulatory <br />agencies that construction is in compliance with the Construction Drawings and the Contract SpecifIcations, <br /> <br />Decisions on Disagreements: <br /> <br />00710 - 16 <br /> <br />:i [-:t <br />~ ~~:~ <br />