Laserfiche WebLink
<br />SECTION 01450 <br /> <br />QUALITY CONTROL <br />UNFAVORABLE CONSTRUCTION CONDITIONS <br /> <br />During unfavorable weather, wet ground, or other unsuitable construction conditions, the CONTRACTOR shall <br />confme his operations to Work which will not be affected adversely thereby. No portion of the Work shall be <br />constructed under conditions which would affect adversely the quality or efficiency thereof, unless special means or <br />precautions are taken by the CONTRACTOR to perform the Work in a proper and satisfactory manner. <br /> <br />01450 - 1 <br /> <br />(\ . ,.'9. <br />~ r~l <br />". ~. <br />:,; 0Ie'/ <br />1~~,vJ <br />