My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-801
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 12:19:49 PM
Creation date
1/25/2006 1:57:54 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-801
Date (mm/dd/yyyy)
06/09/2005
Description
– Awd Bid05-04-02:Agmt w/Vila&Son, Landscape Impv Atlantic Isle.[O’Leary]
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. After sod is in place it shall be top dressed with sufficient sharp, clean sand, free of weeds <br />or weed seeds, to fill all voids remaining and thoroughly watered to wash the top dressing <br />into the sodded surface. The completed sodded surface shall be true to finish grade indicated <br />on the plans, even and firm at all points. Contractor shall keep new sod properly watered <br />until final acceptance. <br /> <br />3. Protect sodded areas against trespassing and damage of any kind for the duration of <br />maintenance period. <br /> <br />4. Sodded areas shall be planted a minimum of one month prior to fmal subgrade. <br /> <br />3.07 CONSTRUCTION REVIEW: <br /> <br />A. In addition to other progress construction reviews, the CONTRACTOR shall schedule and facilitate <br />the following subtrade related reviews, giving the CONSULTANT at least 48 hours before notice. <br /> <br />I. Review of proposed tree pit locations, as represented by staking. <br /> <br />2. Review, upon delivery, of plant materials at the site to verifY species, vigor, size, condition, <br />shape, quantity, in compliance with specifications and drawings. <br /> <br />3. Review of tree pit excavation and fme subgrade. <br /> <br />4. The CONSULTANT shall have the right to review and hand select the Medjool Date Palms <br />at a holding facility in the State of Florida prior to delivery to job site. Hand selection shall <br />be performed at the discretion of the CONSULTANT. <br /> <br />5. Review of all backfilling for palm and tree pits as well as the placement of the soil blanket. <br /> <br />6. Review of Work and materials after completion of planting. This review shall be scheduled <br />sufficiently in advance and in cooperation with the CONSULTANT so that it may be <br />conducted within 48 (forty-eight) hours after completion of planting. <br /> <br />7. Review after a 3D-day (thirty) period of maintenance, upon written request by the <br />CONTRACTOR. Request shall be received at least five days before anticipated date of <br />review. <br /> <br />8. Review for final acceptance. <br /> <br />3.08 MAINTENANCE <br /> <br />A. General: The CONTRACTOR shall maintain all planting, starting at the time of planting and <br />continuing until all planting is complete and accepted by the CONSULTANT. <br /> <br />B. Work Included: <br /> <br />]. Maintenance shall include all mowing, watering, weeding, fertilizing, cultivating, spraying, <br />adjustment of guying, staking and pruning necessary to keep plant materials in a healthy <br />vigorous growing condition and keep planted areas neat and attractive. <br /> <br />2. Provide all equipment and means for proper application of water to those planted areas not <br /> <br />02900-9 <br /> <br />~ <br />i w.t <br />~ ~t:.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.