Laserfiche WebLink
<br />IUbmittals. Each Sample will be identified clearly as to <br />material, Supplier, pertinent daIa such IS catalOJ numbeR, <br />ad the use for which ~ and otherwise as ENGINEER <br />may require to enable ENGINEER to review lbc submittal <br />for tbc limited purposes required by paragraph 6.17.E. The <br />,,"m~ of each Sample to be submitted will be as specified <br />in the SpecifICations. <br /> <br />c. Where a Shop Drawing or Sample is required by the <br />Coouact DocumcDlS or the schedule of Shop Drawings and <br />Sample submittals acceptable to ENGINEER as required by <br />paragraph 2.07, any related Work performed prior to <br />ENGINEER's review and approval oflbc pertineD1 submittal <br />will be at the sole expeose and responsibility of <br />CONTRACTOR. <br /> <br />D. Submittal Procedures <br /> <br />1. Before submittiDg each Shop DrawiD& or Sample. <br />CONTRACTOR shall have determined and verified: <br /> <br />a. all field measurelDCDtl, quamities, dimeD- <br />sions, specif1cd perfOI'JlJaDCC criteria, installatioD <br />requirelllCDU, materials, catalog numbers, and <br />similar information with respect thereto; <br /> <br />b. all materials with respeclto iDrcnded use, <br />fabrication, shipping, handling, storage, assembly, <br />and installation pertaiDiDg to the performance of the <br />Work; <br /> <br />c. all information relative to meaDS, methods, <br />techDiqucs, sequeoces, aDd proceclureI of CODSUUC- <br />don ad safety precaJJtiopll aDd proJrIIDI IDcideal <br />cbercCoi and <br /> <br />d. CONTRACfOR IhaIlI1so baYe mriewed <br />ad coordiDIred each Shop DIawiD& or Sample widl <br />otbel' Shop DrawiDgI mI Samples mI with Ibe <br />rc:quircmems of d1e Wort and the CoaInIct Docu- <br />1DCDfa. <br /> <br />Drawina aDd Sample submiucd to ENGINEER for review <br />aDd approval of each such variation. <br /> <br />E. ENGINEER's Revi~ <br /> <br />I. ENGINEER will timely review and approve <br />Shop Drawings and Samples in accordaDce with the <br />schedule of Shop Drawings and Sample iubmittals <br />acceptable to ENGINEER. ENGINEER's review and <br />approval wW be oo1y to det.erm.iDc if the items covered by <br />the submittals will, after installation or incorporation in <br />the Work, conform to the informatioD given in the <br />CODtr&Ct Documcots and bC compatible with the design <br />coacept of the completed Project IS a fuDctiooiDg whole <br />as indicated by the Cootract Documeots. <br /> <br />2. ENGINEER's .review and approval will DOt <br />extcod to means, methods.. tecbDiques, sequences, or <br />procedun:s 'of'"CODStt1Jdioo (exeept where . particular <br />meaos, method, tecJmique, sequence, or procedure of <br />COOSUUCIioa is spcclfically and expressly called for by the <br />Coattad ~) or ~ safety precaudoDs or programs <br />incidem thereto. The review and approval of. separate <br />item as such will DOt iDtIil'-ate approval of the assembly in <br />which the item fuDctioos. <br /> <br />3. ENGINEER's review and approval of Shop <br />Drawings or Samples sball DOt relieve CONTRACTOR <br />from responsibility for any variation from the require- <br />ments of 1be CoDlract DocuT"e"ts uoless CONTRACTOR <br />bas in writiD& called ENGINE.BR'. ~ to each such <br />variation II the time of each submiUal as required by <br />paragraph 6.17.D.3 and ENGINBBR. bas pea wriUeD <br />approval of each such varia1ia1 by sperJ& 'fII'iUal <br />DOCatioIl dIereof iDcoIporated ill or ICCOIIIpIIl)'iJ die <br />Sbop DmriD& ex' Sample IppmY&l: 110I' will my appnwal <br />by ENG1NBEIl relieve CONTRACI'OR .&om <br />rapoasibility. far'.complyiDg:widl die reqaIremeaII of <br />paragraph 6. 17.D.1. <br /> <br />F. Ruubmlttol Proceduru <br /> <br />1. CONTRAcroR shall mate c:orrec:doos required <br />by ENGINEER md Iba1I reIUrD die required D'Jrober of <br />corrected copies of Shop DrawiD&s aDd submit u <br />required DeW Samples for review and approval. CON- <br />TRAcroR IbaIJ direct lpCCificaueadon ill wridD& to <br />revisioaI ocber dIaD die COI"RlCdoas caDecl for by ENGI- <br />NEER 011 previous 1UbmittaII. <br /> <br />6.18 01tItIn1IlnI* Wort <br /> <br />, <br />A. CON'IltACI'OR sbaI1 carry on tbe Work and adben: <br />to Ibe proJRII smedu~ duriDg 111 disputes or disapee~ <br />with OWNER. No Work sbaD be delayed or posepaaod <br />pe:adiDa raoludoa of Ill)' dispntes or ~, except <br /> <br />00700 - 24 <br /> <br />2. Each submiaal shall bear . stamp or specifIC <br />wriuaI 1nd;,.,tinQ dW CONTRACTOR has satisfied <br />CONTRACTOR'. obligatioas UDder die CoDlract <br />DocuIrnN wiIh rapec:c to CONTRACTOR'. review and <br />approval of tbat submittal. <br /> <br />3. Atlbe time of cadi submittal, CONTRACfOR <br />shall pe ENGINEER spedfic writteIl aodce of such <br />YIIiadaas. if 1IIf. dill die $bop: DmriDI or Sample <br />IUbmiaed 11II1 haw &om die ~ of die <br />CoIdnd Docuu-t'J. such DOCke to be ill . writtaa com- <br />pwlll~ separate from die submittal; aod, ill additioD. <br />shall cause a specific DOWioa to be made 011 eadl Sbop <br />