<br />or respoasibUiry or die uaderIaJda&, exercise, or pcrfOl'1DllJCe
<br />of aD)' aucboriry or rapoDSibility by ENGINEER sbaJ1 c:reaIC,
<br />impose, or Jive rise 10 III)' duty in contract, lOn, or
<br />otherwise owed by ENGINEER lO CONTRACTOR, any
<br />Subc:ontraclOr, any Supplier, any other individual or entity,
<br />or to any surety for or employee or agcot of any of them.
<br />
<br />B. ENGINEER will not supervise, direct, conlrOl, or
<br />have aulhority over or be responsible for CONTRACTOR's
<br />means, methods, Ieclmiques, seqUCDCCS, or procedures of
<br />constJUCtion, or the safety precautions and programs incident
<br />thereto, or (or III)' (ailure of CONTRACTOR 10 comply with
<br />Laws and RcauJations applicable lO the performance of the
<br />Work. ENGINEER will DO( be responsible for
<br />CONTRACTOR', failure 10 pcrfonn the Work in accordance
<br />wilh the Contract Documents.
<br />
<br />c. ENGINEER will DOt be responsible for tbc acu or
<br />omissions of CONTRACI'OR or of III)' SubcoaIractor, 811)'
<br />Suppla', or of III)' other individual or entity pcrformiDg any
<br />of the Work.
<br />
<br />D. ENGINEER', review of the fmal Application (or
<br />Payment and accompaayiDg documentation aDd all mainte-
<br />nm:e aad operatiDg iDsuuctiODS, schedules, guarantees,
<br />Bonds, certificates of inspection. tests and approvals, and
<br />odler documentation required 10 be delivered by paragraph
<br />14.07.A will only be 10 determine generally that their content
<br />complies with cbe requirements of, and in the case of
<br />certifICates of iDspecdons, tests, and approvals tbat the results
<br />cenified indicate compliaDce with. tbc Comract Documents.
<br />
<br />E. Tbe limlufloas apoIl audIority and responsibilily let
<br />Iordl ill dIis parI8rIph 9.10 JbaU aJro apply 10 ENGINEER',
<br />Ct-q'I1.., Rc8deat Pmjec:t Rcpresemadvc, IIId -nst."t,.
<br />
<br />ARDCLE 10 - alANGES IN mE WORK: CLAIMS
<br />
<br />10.01 ~ Oumgu In the W41rt
<br />
<br />A. Witbout inv,lwfi-. lbc Agreemem and without
<br />DOdc:c to III)' surety, OWNER may, II any time or from time
<br />to time, order addWoas, deledoas, or rcvisioas in lbc Work
<br />by · Wriaca AIIII!ftIf~ a OwJae Order, or a Work
<br />l'"h."V Dincdve. Upaa receipt of 811)' such Mtonwut,
<br />CONTRACI'OR IbaII prompdy proceed willa lbc Work
<br />iavoIwd wIdda will be performed UDder die applicable
<br />coadidoas of die CoIdncc D-t--us (eJU:ep( II ocbenvise
<br />1pCcifx:aUy pnMded).
<br />
<br />B. ICOWNER aDd CONTRACTOR IR uaabIc 10 ape
<br />oa CDddcmall to. or 011 die IIDOUIII or eDaII. if 1Il)', of ID
<br />1Id,jutnJem ia die CoaIncl Price or CGattact TUDeI, or bod&.
<br />dw should be allowed II a rauJc of a Work Claage
<br />
<br />00700 - 29
<br />
<br />Directive, a Claim may be made therefor as provided in
<br />paragraph 10.05.
<br />
<br />10.02 UNlUthorized CJrDngu ;n the W41rt
<br />
<br />A. CONTRACTOR sbaU DOt be entitled CO an increase
<br />in the Contract Price or ID extension of Ihe CODttact Times
<br />with resped to any worlc performed dw is DOC requir~ by
<br />the ConlraCt Documents as amended, modified, or
<br />supplemented as provided in paragraph 3.04, except in the
<br />case of an emergency as provided in paragraph 6.16 or in the
<br />case of uncovering Wort as provided in paragraph 13.04.B.
<br />
<br />10.03 ExeCU/;41n 41lOIange Orders
<br />
<br />A. OWNER and CONTRACTOR shall execute
<br />. appropriate Clange Orden fI"1YW'IImendecf by ENGINEER (or
<br />Written Ameadmeals) covering:.
<br />
<br />I. changes in the Work which are: (i) ordered by
<br />OWNER punuam to paragraph 10.01.A, (ii) required
<br />becaust or acceptaDce of defective Work UDder para_
<br />graph 13.08.A or OWNER's correction of defective
<br />Wort UDder paragraph 13.09. or (ill) agreed 10 by die
<br />parties;
<br />
<br />2. changes in the Contract Price or Contract TimeS
<br />which are agreed 10 by die parties, including any
<br />undisputed sum or amount of time for Worlc actually
<br />performed in A:c:ordaac:e with a Wort OJange Directive;
<br />and
<br />
<br />3. ('.h~ ill die Coatract Price or Coattact TUDeI
<br />which embody die nhet.1ft of any' wriueD decision
<br />IaIdenld by .ENGINEER punuaatto paragraph 10.OS;
<br />pnwided dial. Ia Ilea of a~ ., IIIda n.....
<br />Order. a IppeIl may be IIba fmm., 1IIda~
<br />III ICCOIdIIIce wida dIe'.pmvtsica of' die Comract
<br />- .~""'"IIlI.aad ...,..... Laws .. RerIJdoas~ b9t
<br />.' duriaa'ID)'..uch1lppeale.'CONTRACTOR IbaII cany OIl
<br />Cbe Work ad Idbere' to cbe progrea ldIeduJe u
<br />provided in pangraph 6.18.A. -
<br />
<br />10.04 N41tijiClIliqn to Surety
<br />
<br />A. If.DOticc or IDlY dwIae .affeCcia& cbe geaeraJ scope
<br />of cbe Work or die pnwisjaas of die Comract ~
<br />(iDcluclia& but DOl Iimfted 10. Coatract Price 01' CoattIct
<br />Tames) is required by Ibc JJNYisiaas of ., Boad to be givea
<br />to a mray. die giviDa of my JUda DOdcc will be
<br />CONTRACI'OR', ~. TIle .1IIftIIqf of ead1
<br />IppIqbJe Boad wiD be adjusred to IdJect die eft'ect of IIIj
<br />such dwlge.
<br />
|