My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-825
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:15:50 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-825
Date (mm/dd/yyyy)
09/08/2005
Description
– Ratify Agmt w/Siltek Group Inc., Construction of 181st Drive Active Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br /> <br />u <br /> <br />n <br />u <br /> <br />n <br />u <br /> <br />fI <br />U <br /> <br />(I <br />U <br /> <br />fI <br />u <br /> <br />n <br />u <br /> <br />n <br />U <br /> <br />11 <br />LJ <br /> <br />\l <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />11 <br /> <br />LJ <br /> <br />n <br />u <br /> <br />n <br />U <br /> <br />n <br />LJ <br /> <br />n <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />181ST ACTIVE PARK <br /> <br />APRil 10, 20057-22-05 <br /> <br />Followinq Paraqraph A€I€l-14.02.A.~4 add::- <br /> <br />-~ !!An original Partial Release of Lien is required from the General <br />Contractor along with the application for Payment No. 1 and for each <br />subsequent application thereafter. For each application for payment <br />(excluding Application No.1) the Contractor shall submit with the <br />application Partial Releases of Liens for all Notice to Owners that have <br />been received for the project by the Owner and Engineer". <br />5. With each Application for Payment. the Contractor shall submit supporting <br />records and other evidence, in a form and amount acceptable to the City <br />and the Enqineer, to demonstrate the expenses incurred and the Work <br />performed. This shall include, but not be limited to documentation related <br />to the purchase of Owner-Provided Material and the reduction in the <br />Contract Sum as a result of such expenditures. <br />6. Each application for Payment shall be based on the most recent schedule <br />of values submitted by Contractor in accordance with the Contract <br />Documents. The schedule of values shall allocate the entire quaranteed <br />maximum Contract Price amonq the various portions of the Work, except <br />that the Contractor's Fee shall be shown as a separate item. The <br />schedule of values shall be prepared in such form and supported by such <br />data to substantiate its accuracy as the Enqineer may require. This <br />schedule, unless obiected to by the Enqineer, shall be used as a basis for <br />reviewinq the Contractor's Applications for Payment. <br />7. Applications for payment shall show the percentaqe of completion of each <br />portion of the Work as of the end of the period covered by the Application <br />for Payment. The percentage of completion shall be the lesser of: (1) the <br />percentaqe of that portion of the Work which has actually been <br />completed: or (2) the percentaqe obtained by dividinq (a) the expense <br />that has actually been incurred by the Contractor on account of that <br />portion of the Work for which the Contractor has made or intends to make <br />actual payment prior to the next Application for Payment by (b) the share <br />of the Contract Price allocated to that portion of the Work in the schedule <br />of values. <br />8. Subiect to the provisions of the Contract Documents, the amount of <br />proqress payments shall be computed as follows: <br />a) take that portion of the Contract Price properly allocable to the <br />computed Work as determined by multiplyinq the percentaqe of <br />completion of each portion of the Work in the schedule of values. <br />Pendinq final determination of the costs to the Owner of chanqes <br />in the Work, amounts not in dispute shall be included in the <br />Application for Payment alonq with Chanqe Order, Work Change <br />Directive or Written Amendment indicatinq the parties' aqreement <br />with all or part of such costs for additional Work. <br />b) add the portion of the Contract Price properly allocable to <br />materials and equipment delivered and suitably stored at the site <br />for subsequent incorporation in the Work, or, if approved in <br />advance by Owner, suitably stored off-site at a location aqreed <br />upon in writing. <br />c) add the Contractor's Fee, less the ten percent (10%) Retainaqe. <br />The Contractor's Fee shall be computed upon the Cost of the <br /> <br />SUPPLEMENTARY CONDITIONS <br /> <br />00800-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.