My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-825
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:15:50 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-825
Date (mm/dd/yyyy)
09/08/2005
Description
– Ratify Agmt w/Siltek Group Inc., Construction of 181st Drive Active Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br /> <br />LJ <br /> <br />)l <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />r, <br /> <br />LJ <br /> <br />)l <br /> <br />LJ <br /> <br />n <br /> <br />Li <br /> <br />fl <br /> <br />LJ <br /> <br />)l <br />Li <br /> <br />fl <br />Li <br /> <br />fl <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />)l <br />Li <br /> <br />fl <br />LJ <br /> <br />fl <br />LJ <br /> <br />n <br /> <br />Li <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />fI <br /> <br />LJ <br /> <br />181ST ACTIVE PARK <br /> <br />APRIL 10, 20057-22-05 <br /> <br />7. <br /> <br />subcontractor, should circumstances iustify such action in the Owner's sole <br />iudqment. <br />Upon Substantial Completion of the entire Work of the Contractor, a sum, <br />sufficient to increase payments to the Contractor to one hundred percent <br />(100%) of the Contract Sum, less amounts, if any for incomplete Work and <br />unsettled claims, shall be paid to Contractor with the next sequential payment <br />application after Substantial Completion is obtained. <br /> <br />Delete Paraqraph 14.05 and replace with the followinq: <br /> <br />A. The Owner may OCCUpy or use any completed or partially completed portion of <br />the Work at any staqe when such portion is desiqnated by separate <br />aqreement with the Contractor, provided such occupancy or use is consented <br />by the insurer. in accordance with Paraqraph 5.06.A.5 and as authorized by <br />public authorities havinq iurisdiction over the Work. Such partial occupancy <br />or use may commence whether or not the portion is substantially complete. <br />provided Owner and Contractor have accepted in writinq the responsibilities <br />assigned to each of them for payments, Retainaqe, if any. security, <br />maintenance, heat, utilities, damage to Work and insurance, and have aqreed <br />in writinq concerninq the period for correction of Work and commencement of <br />warranties required by the Contract Documents. When the Contractor <br />considers a portion substantially complete, the Contractor shall prepare and <br />submit a comprehensive list to the Enqineer of the items to be completed or <br />corrected prior to final payment. The Failure to include an item on such list <br />does not alter the responsibility of the Contractor to complete all Work in <br />accordance with the Contract Documents. Consent of the Contractor to <br />partial occupancy or use shall not be unreasoanbaly withheld. The staqe of <br />the proqress of the Work shall be determined by written agreement between <br />the Owner and the Contractor, or if no aqreement is reached, by decision of <br />the Enqineer. <br /> <br />8. Immediately or prior to such partial occupancy or use, the Owner, Contractor, <br />and Enqineer shall iointly inspect the area to be occupied or the portion of the <br />Work to be used in order to determine and record the condition of the Work. <br /> <br />C. Unless otherwise aqreed upon, partial occupancy or use of a portion or <br />portions of the Work shall not constitute acceptance of the Work not <br />complyinq with the Contract Documents." <br /> <br />In the first sentence of Paragraph 14.05.A2., fullo'Ning the word .....Worle...., in::;ert thc words <br />.....or to place and install equipment...... <br /> <br />At the end of Paragraph 14.07.A2. after, ...with the 'Nork. Imert, "(iv) acceptance by the <br />Owner::; and gO'Jerning agencies <br />After the least sentence in Paraqraph 14.04.8, insert the followinq: <br /> <br />"C. Once 1) the definitive certificate of completion has been issued to the Owner <br />and the Contractor and 2) once consent of the surety, if any, has been <br />obtained, the Owner shall make payment of Retainaqe applyinq to such Work <br /> <br />SUPPLEMENTARY CONDITIONS <br /> <br />00800-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.