My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-825
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:15:50 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-825
Date (mm/dd/yyyy)
09/08/2005
Description
– Ratify Agmt w/Siltek Group Inc., Construction of 181st Drive Active Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />paragrapb 6.05.A.I, it will be considered a proposed <br />substitute item. <br /> <br />b. CONTRACTOR shall submit sufficient <br />information as provided below to allow ENGINEER <br />to detcrmiDe that the item of material or equipment <br />proposed is essentially equivalent to that named and <br />an acceptable substitute therefor. Requests for <br />review of proposed substitute items of material or <br />equipment will not be accepted by ENGINEER from <br />anyone other than CONTRACTOR. <br /> <br />c. The procedure for review by ENGINEER <br />will be as set .forth in paragraph 6.0S.A.2.d, as <br />supplemented in the General Requirements and as <br />ENGINEER may decide is appropriate under the <br />circumstances. <br /> <br />d. CONTRACTOR sba11 rust ma.kc writteD <br />application to ENGINEER for review of a proposed <br />substitute item of material or equipment chat <br />CONTRAcrOR seeks to furnish or use. The <br />application sball cenify that the proposed substitute <br />item will perform adequately the functions and <br />achieve the results called for by the geaeral design, <br />be similar in substance to lbat specified, and be suited <br />to the same use as that specified. The application <br />will stale the extent, if any, to which the use of the <br />proposed substitute item will prejudice <br />CONTRAcrOR's achievement of Substantial <br />Completion on time, whether or DOt use of the <br />proposed substitute item in the Work will require a <br />cbaoge in any of the CoaIract 00cumeDIs (or in the <br />provisioDs of any otber diRct CODIl'8Ct with OWNER. <br />for wort OD the Project) to adapt the design to the <br />proposed substitute BIll aDd whether or DOt <br />iacolporadoa or use of die proposccInbsdtoodtcm <br />in CCIIJIICdioD widllbc Work is subject to paymcm of <br />any IkeDse fee or royalr;y. All variations of dJe pro- <br />posed substitute item from that specified will be <br />identified in the application, and available <br />engiaccriog, sales, maintenlltJee. repair, and <br />replacement services will be indicated. The <br />application will also cootain an itemized estimate of <br />all costs or credits that will result directly or indi- <br />reedy from use .of 1UCh' substitute item, iDcluding <br />COSCS of RCIcsip aDd claims of ocher CODtt8CtOrS <br />affeccecl by any RSUl&iD& chaoge, aU of which will be <br />COIISidaal by ENGINEER in eval1WiDg dJe proposed <br />substitute item. BNGn.qmR may I'ClQIIR CON- <br />TRAcroR to fumish additioaal data about tbe pro- <br />posed subscitutc item. <br /> <br />B. SubstiIIIIe 0Jnstrut:IiDn MelhtxJs Dr PrtJCedJuu: If a <br />lpCCiflC meaDS, mccbod, Iedmique, scqueace, or proccclure <br />Iii coastnICdoa Is sboWD or Indicated ill aDd expressly <br /> <br />00700 - 20 <br /> <br />n <br /> <br />u <br /> <br />required by the Contract Documents, CONTRACTOR may <br />furnish or utilize a substitute means, method, tedmique, n <br />sequence, or procedure of CODSUUCtion approved by ENGI- <br />NEER. CONTRACTOR sbaIJ submit sufficient iDformatic <br />to allow ENGINEER, in ENGINEER's sole discretion, t~ <br />determine that the substitute proposed is equivalent to that n <br />expressly called for by the CoDttlCt Documents. The proce- u <br />dure for review by ENGINEER. will be simUar to that <br />provided in subparagraph 6.OS.A.2. <br /> <br />u <br /> <br />n <br /> <br />LJ <br />C. EngiMer's EvabJa/ion: ENGINEER will be allowed <br />a reasonable time within which to evaluate each proposal or n <br />submittal made pW'SUllll to paragraphs 6.05.A and 6.05.B. <br />ENGINEER will be the sole judge of acceptability. No U <br />"or-equaJ" or substitute will be ordered, installed or utilized <br />until ENGINEER's review:is complete, which will be <br />evidenced by either a CbaDge. Order for a substitute or an <br />approved Shop Drawing for an ~or equal.. ENGINEER will <br />advise CONTRACTOR in writing 'of any negative <br />determination. <br /> <br />n <br /> <br />\ <br />U <br /> <br />fl <br />u <br /> <br />D. Special Guaranree: OWNER may require CON- <br />TRACTOR 10 furnish at CONTRAcroR's expense a special <br />performance guarantee or other surety with respect to any <br />substitute. <br /> <br />n <br />LJ <br /> <br />E. ENGINEER's Cost.ReimbursemelU: ENGINEER will <br />record time required by ENGINEER and ENGINEER's <br />Consultants in evaluatiDg substitute proposed or submitted by <br />CONTRAcroR pursuant to paragraphs 6.05 .A.2 aDd 6.05.1 <br />and in making dJaD&es in the Coatract Dot.."ments (or in the <br />provisions of any oCher direct coattact with OWNER for <br />wort OD the Project) occasicmed thereby. Whether or DOt <br />ENGINEER. approves a subsliUIre Item 10 proposCcl or <br />submitted by CONnAcroR, CONTRACI'OR sbaIl <br />reimburse OWNER for the c:haqeI of BNGINBBR aDd <br />. ENaINEER.'~'rw-'f1nIN .for.eval1llldDg each IId1 proposed <br />substiuItc. <br /> <br />n <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br />u <br /> <br />P. CO.N'IXAcroR~ Expense: CONTRACTOR shall <br />provide all data in support of any proposed substitute or <br />"or-equa1" at CONTRACTOR's expease. <br /> <br />n <br />u <br /> <br />n <br /> <br />6.06 Concerning SubcolUractors. Suppliers, and Others LJ <br /> <br />A. CONTRAcroR sbal1 DOt employ any SubcoDttaCtOr, <br />Supplier, or oCber iadividual or aWty (iDcludiDg those <br />acceptable to OWNER IS iDdicatecl in paracraph 6.06.B), <br />wbctbcr iDidaJly or. a RP1acemem,.apiast wbom OWNER <br />may ha~ ra~lI~ objectioD. OONTRACI'OR sbaU DOt be <br />required 10 employ any SUbc:oattactor, Supplier, or ocher <br />iDdi&ual or eadty to furaiIh or perform any of cbe Work <br />against whom CONTRACTOR bas IeUODIble obJec:Uoll. <br /> <br />B. Ifthc Supp'L'!IIV'.IItJII~ CoadiCioas require the idcDtity <br />of certain SubcoDttactorl, SUppliers, or 0Cbcr individuals or <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />, <br /> <br />n <br /> <br />LJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.