Laserfiche WebLink
<br />11 <br /> <br />LJ <br /> <br />11 <br /> <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; <br />CHANGE OF CONTRACT TIMES <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />12.01 aumgt of Cofl/rDct PriCt <br /> <br />n <br /> <br />A. The Contract Price may oo1y be changed by a <br />Change Order or by a Written Amendment. Any Claim for <br />an adjustmCDt in the ContraCt Price shall be based on written <br />notice submitted by Ihe party m.alciDg Ihe Claim to the <br />ENGINEER and the other party to the Contract in accor- <br />dance with the provisions of paragraph 10.05. <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />il <br /> <br />B. The value oC'any Work covered by a Change Order <br />or of any Claim for an adjustment in the Contract Price will <br />be determined as follows: <br /> <br />LJ <br /> <br />n <br /> <br />I. where the Work involved is covered by unit <br />prices c:ontaiDed in rhe CoDttact DocumentS, by applica- <br />tion of such unit prices 10 the quantities of the items <br />involved (subject to the provisions of paragraph 11.03 ); <br />or <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />2. where the Wort involved is not covered by unit <br />prices contained in the Contract Documents, by a <br />mutually agreed lump sum (which may include an <br />allowance for overhead and profit not necessarily in <br />accordance with paragraph 12.01.C.2); or <br /> <br />u <br /> <br />II <br /> <br />LJ <br /> <br />11 <br /> <br />3. where the WOIX involwd is not covered by unit <br />prices coDtaiDcd in the Contract Documems and agree- <br />ment 10 a lump sum is DOt reac:bed under paragraph <br />12.01.B.2, on tbe basis of the Cost of the Work <br />(determiDed IS provided in paragraph 11.01) plus a <br />CONTRACI'OR's fee for overhead aDd profit (deter- <br />m.iDed IS provided ill paragraph 12.01.C). <br /> <br />LJ <br /> <br />11 <br /> <br />u <br /> <br />11 <br /> <br />C. CONllUC1'OR's Fu: Tbc CONTRACTOR's fee <br />for ovcrhead aDd profit shall be determined as follows: <br /> <br />L-J <br /> <br />n <br /> <br />1. a mutUally acceptable fixed fee; or <br /> <br />LJ <br /> <br />2. if a fixed fee is DOt agreed upon, Ihcn a fcc <br />based OD the fol1owiD& percentages of the various <br />portions of the Cost of the Work: <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />a. for COSIS iDcurred under paragraphs <br />11.01.A.l aDd 11.01.A.2, the CONTRACTOR's <br />fee sbaD be 15 pcrc:em; <br /> <br />b. for COSIS ~ under paragraph <br />1l.01.A.3, die CONTRACTOR's fee shall be fIVe <br />pcrccat; <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />c. where ODC or more ticri of subc:oDtracts arc <br />OD the basis of Cost of die Work plus a fee md DO <br /> <br />u <br /> <br />II <br /> <br />00700 - 33 <br /> <br />LJ <br /> <br />fixed fee is agreed upon, the intent of paragraph <br />12.0l.C.2.a is that the SubcoDtraCtor who actually <br />performs the Work, at whatever tier, will be paid <br />a fee of IS percent of the costs incurred by such <br />Subcontractor under paragraphs 11.01.A.I and <br />11.01.A.2 and that any higher tier SubcoDtraCtor <br />and CONTRACTOR will each be paid a fee of five <br />perccnt of the amount paid 10 the next lower tier <br />Subcontractor; <br /> <br />d. no fee shall be payable on the basis of costs <br />itemized under paragraphs 11.01.A.4, 11.01.A.S, <br />and 11.01.B: <br /> <br />e. Ihe amount of credit to be allowed by <br />CONTRACTOR to OWNER for any change which <br />results in a net decrease in cost will be the amount <br />of tbe acwa1 act decrease.in cost plus a dt:duction in <br />CONTRACTOR's fcc by an IJDOW1t equal to five <br />percent of such act decrease; and <br /> <br />f. when both additions and credits arc in- <br />volved in anyone chaoge, the adjustment in <br />CONTRACTOR's fee shall be computed on the <br />basis of the act change in accordance with para- <br />graphs 12.01.C.2.a through 12.01.C.2.e, inclu- <br />sive. <br /> <br />12.02 <br /> <br />Clumge of Contract Times <br /> <br />A. The Comract Times (or MilCSlODCS) may only be <br />changed by a Change Order or by a Written AmcDdmcnt. <br />Any Claim for an adjustlDmll in Ibe ~ Times (or <br />MilestODe$) sba1l be based on wriucn DOdce aubm.lued by the <br />party making die c1aim. to b BNGINBBR. aDd cbe Other <br />party to Ibe CoatrICl ill accordaDce wida Cbe provisioDS of <br />pmgraph 10.05. <br /> <br />B. Any adjUStmeDl of the Com:rIct Times (or <br />MUcsumcs)covca:d.by a CbaDle:Ordcr or of lID)' Claim for <br />an adjUStmcDt in the Contract Times (or Milestones) wD1 be <br />determined in accordance with 'Ibe provisions of this <br />Article 12. <br /> <br />12.03 De1D.ys Beyond CONTRACTOIl's ConlTOl <br /> <br />A. Where CONTRACTOR is ~ from <br />complctiDg IDY part of the Work within the Contract Tames <br />(or Mncstoaes) clue to delay beyODd rile comro1 of <br />CONTRACI'OR, Cbe Coattact TUDeS (or Milestoaes) wi1I be <br />cXf.CDded in ID aDIOUId equal to die time lost clue to sacb <br />delay rt a Claim is made chetefor IS provided in parqraph <br />12.m.A. Delays beyond the CODtrOl of CONTRACTOR <br />sbal1 include, but DOt be lim1rcd to, ICCI or DCg10ct by <br />OWNER, acu or aeeJcct of ud1Jty owaen or other <br />coottacton pcrfol'llliDg other work ~ CODlCmp1ated by <br />