My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-826
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:16:04 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-826
Date (mm/dd/yyyy)
09/08/2005
Description
– Ratify Agmt w/Calvin Giordano, Improvements 172nd St.& No. Bay Rd Area.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Authorization No. J 9 <br />July 11,2005,2005 <br />Calvin, Giordano & Associates, Ine, Proposal No, 03-4197 <br /> <br />CITY OF SUNNY ISLED BEACH <br />NE 1720d Street and North Bav Road <br /> <br />PROJECT DESCRIPTION: <br /> <br />1. SCOPE OF SERVICES <br /> <br />I. Professional Land Surveying Services <br /> <br />A. Design Survey <br /> <br />Determine existing roadway elevations within right-of-way and adjacent to <br />right-of-way, and locate existing driveways, structures, fencing, trees and other <br />physical features as specified by the engineer. Prepare CADD base file with all <br />information relevant to roadway engineering design. <br /> <br />II. Professional Civil Engineerin.g Services <br /> <br />A. Underground Utility Location <br /> <br />Locate existing underground utilities for the purposes of locating potential <br />conflicts with proposed utilities. Existing utilities shall be identified as to type, <br />material and elevation. This information shall be input into a Geographic <br />,Information System (GIS) for the purposes of providing a map of existing <br />utilities within the roadway. It is anticipated that seventy (70) holes will be <br />needed. <br /> <br />B. Preliminary Investigation <br /> <br />Visit and inspect site to determine existing conditions. Take photos, make <br />written documentation, sketches, notes and research specific codes, regulations <br />and requirements. Collect all existing as-builts. Attend one (1) meeting with <br />the City to discuss the City's plans for the roadway layout. Coordinate with all <br />governmental agencies that have jurisdiction over the site. <br /> <br />C. Preliminary Design <br /> <br />Prepare a preliminary layout of the proposed roadway for presentation to the City. <br />Attend one (1) meeting to go over the City's comments. Revise the preliminary <br />plans per the City's comments. <br /> <br />D. Design Phase <br /> <br />Prepare proposed engineering design for NE 172nd Street and North Bay Road <br />while taking into account location of existing driveways, sidewalks, right-of- <br />way lines, trees, structures and existing grades. <br /> <br />P:\Proposals\2003 Proposals\034 I 97 NE 172nd St and N Bay Road Revised ILdoc <br /> <br />S\B <br />
The URL can be used to link to this page
Your browser does not support the video tag.