My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />u <br /> <br />II <br /> <br />'--J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />i' <br /> <br />LJ <br /> <br />n <br /> <br />L-J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />" <br /> <br />u <br /> <br />n <br /> <br />\-1 <br /> <br />1.04 PROGRESS MEETINGS <br /> <br />06/05 <br /> <br />A. <br /> <br />Schedule regular periodic meetings. The progress meetings will be held as required by <br />progress of the work. <br /> <br />B. <br /> <br />Hold called meetings as required by progress of the work. <br /> <br />C. <br /> <br />Location of the meetings: Project field office of the Contractor or Engineer. <br /> <br />D. <br /> <br />Attendance: <br /> <br />1. <br /> <br />Engineer, and his professional consultants as needed. <br /> <br />2. <br /> <br />Subcontractors as appropriate to the agenda. <br /> <br />3. <br /> <br />Suppliers as appropriate to the agenda. <br /> <br />4. Others as appropriate. <br /> <br />E. <br /> <br />Suggested Agenda: <br /> <br />L <br /> <br />Review, approval of minutes of previous meeting. <br /> <br />2. Review of work progress since previous meeting. <br /> <br />3. <br /> <br />Field observations, problems and conflicts. <br /> <br />4. <br /> <br />Problems which impede Construction Schedule. <br /> <br />5. <br /> <br />Review of off site fabrication, delivery schedule. <br /> <br />6. <br /> <br />Corrective measures and procedures to regain projected schedule. <br /> <br />7. <br /> <br />Revisions to Construction Schedule. <br /> <br />8. <br /> <br />Progress, schedule, during succeeding work period. <br /> <br />9. Coordination of schedules. <br /> <br />10. <br /> <br />Review submittal schedules; expedite as required. <br /> <br />11. <br /> <br />Maintenance of quality standards. <br /> <br />12. <br /> <br />Pending changes and substitutions. <br /> <br />13. Review proposed changes for: <br /> <br />a. <br />b. <br /> <br />Effect on Construction Schedule and on a completion date. <br />Effect on other contracts of the Project. <br /> <br />01200-3 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.