My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rI <br /> <br />L.J <br /> <br />rI <br /> <br />LJ <br /> <br />" <br /> <br />DOCUMENT 01370 <br /> <br />SCHEDULE OF VALUES <br /> <br />II <br /> <br />LJ PART I-GENERAL <br /> <br />1.01 <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />REQUIREMENTS INCLUDED <br /> <br />A. <br /> <br />Submit to the Engineer a Schedule of Values allocated to the various portions of the Work, <br />within 10 days after the effective date of the Agreement. <br /> <br />B. <br /> <br />Upon request of the Engineer, support the values with data that will substantiate their <br />correctness. <br /> <br />C. <br /> <br />The Schedule of Values shall be used as the basis for the Contractor's Applications for <br />Payment. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />(I <br /> <br />u <br /> <br />A. <br /> <br />Section 01152: Application for Payment <br /> <br />LJ <br /> <br />1.03 FORM AND CONTENT OF SCHEDULE OF VALVES <br /> <br />1\ <br /> <br />II <br /> <br />u <br /> <br />f" <br /> <br />'--~ <br /> <br />n <br /> <br />u <br /> <br />r, <br /> <br />'-.J <br /> <br />r-' <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />In <br /> <br />u <br /> <br />06/05 <br /> <br />n <br /> <br />LJ <br /> <br />A. <br /> <br />Type schedule on an 8-1/2 inch x 11 inch or 8-1/2 inch x 14 inch white paper; Contractor's <br />standard forms and automated printout will be considered for approval by the Engineer <br />upon Contractor's request. Identify schedule with: <br /> <br />1. <br /> <br />Title of Project and location <br /> <br />2. <br /> <br />Engineer and Project number <br /> <br />3. <br /> <br />Name and Address of Contractor <br /> <br />4. Contract designation <br /> <br />5. <br /> <br />Date of submission <br /> <br />B. <br /> <br />Schedule shall list the installed value of the component parts to include individual <br />equipment, piping, electrical, paving, of the Work (as required) in sufficient detail to serve <br />as a basis for computing values for progress payments during construction. <br /> <br />c. <br /> <br />For the various portions of the Work: <br /> <br />1. <br /> <br />Each item shall include a directly proportional amount of the Contractor's overhead <br />and profit. <br /> <br />D. <br /> <br />The sum of all values listed in the schedule shall equal the total Contract Sum. <br /> <br />01370-1 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.