Laserfiche WebLink
<br />rI <br /> <br />L.J <br /> <br />rI <br /> <br />LJ <br /> <br />" <br /> <br />DOCUMENT 01370 <br /> <br />SCHEDULE OF VALUES <br /> <br />II <br /> <br />LJ PART I-GENERAL <br /> <br />1.01 <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />REQUIREMENTS INCLUDED <br /> <br />A. <br /> <br />Submit to the Engineer a Schedule of Values allocated to the various portions of the Work, <br />within 10 days after the effective date of the Agreement. <br /> <br />B. <br /> <br />Upon request of the Engineer, support the values with data that will substantiate their <br />correctness. <br /> <br />C. <br /> <br />The Schedule of Values shall be used as the basis for the Contractor's Applications for <br />Payment. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />(I <br /> <br />u <br /> <br />A. <br /> <br />Section 01152: Application for Payment <br /> <br />LJ <br /> <br />1.03 FORM AND CONTENT OF SCHEDULE OF VALVES <br /> <br />1\ <br /> <br />II <br /> <br />u <br /> <br />f" <br /> <br />'--~ <br /> <br />n <br /> <br />u <br /> <br />r, <br /> <br />'-.J <br /> <br />r-' <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />In <br /> <br />u <br /> <br />06/05 <br /> <br />n <br /> <br />LJ <br /> <br />A. <br /> <br />Type schedule on an 8-1/2 inch x 11 inch or 8-1/2 inch x 14 inch white paper; Contractor's <br />standard forms and automated printout will be considered for approval by the Engineer <br />upon Contractor's request. Identify schedule with: <br /> <br />1. <br /> <br />Title of Project and location <br /> <br />2. <br /> <br />Engineer and Project number <br /> <br />3. <br /> <br />Name and Address of Contractor <br /> <br />4. Contract designation <br /> <br />5. <br /> <br />Date of submission <br /> <br />B. <br /> <br />Schedule shall list the installed value of the component parts to include individual <br />equipment, piping, electrical, paving, of the Work (as required) in sufficient detail to serve <br />as a basis for computing values for progress payments during construction. <br /> <br />c. <br /> <br />For the various portions of the Work: <br /> <br />1. <br /> <br />Each item shall include a directly proportional amount of the Contractor's overhead <br />and profit. <br /> <br />D. <br /> <br />The sum of all values listed in the schedule shall equal the total Contract Sum. <br /> <br />01370-1 <br /> <br />03-4138.8 <br />