My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br /> <br />L.J <br /> <br />n <br /> <br />L.J <br /> <br />r, <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />r---. <br /> <br />LJ <br /> <br />r---. <br /> <br />LJ <br /> <br />(1 <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />11 <br /> <br />u <br /> <br />(, <br /> <br />u <br /> <br />rl <br /> <br />u <br /> <br />" <br />L; <br /> <br />n <br /> <br />LJ <br /> <br />,n <br /> <br />u <br /> <br />r---. <br /> <br />L) <br /> <br />n <br /> <br />LJ <br /> <br />C. <br /> <br />Provide to the laboratory the preliminary design mix proposed to be used for concrete, <br />and other materials mixes which require control by the testing laboratory. <br /> <br />D. <br /> <br />Materials and equipment used in the performance of work under this Contract are subject <br />to inspection and testing at the point of manufacture or fabrication. Standard <br />specifications for quality and workmanship are indicated in the Contract Documents. The <br />Engineer may require the Contractor to provide statements or certificates from the <br />manufacturers and fabricators that the materials and equipment provided by them are <br />manufactured or fabricated in full accordance with the standard specifications for quality <br />and workmanship indicated in the Contractor Documents. All costs of this testing and <br />providing statements and certificates shall be a subsidiary obligation of the Contractor, <br />and no extra cliarge to the Owner shall be allowed on account of such testing and <br />certification. <br /> <br />E. <br /> <br />Furnish incidental labor and facilities: <br /> <br />1. <br /> <br />To provide access to Work to be tested <br /> <br />2. <br /> <br />To obtain and handle samples at the Project site or at the source of the product to <br />be tested <br /> <br />3. To facilitate inspections and tests <br /> <br />4. <br /> <br />For storage and curing of test samples <br /> <br />F. <br /> <br />Notify laboratory sufficiently in advance of operations to allow for laboratory assignment <br />of personnel and scheduling of tests. <br /> <br />G. <br /> <br />Employ and pay for the services of the same or a separate, equally qualified independent <br />testing laboratory to perform additional inspections, sampling and testing required for the <br />Contractor's convenience. <br /> <br />H. <br /> <br />Provide the Engineer with a copy of all test and reports. <br /> <br />PART 2 - PRODUCTS (Not Used) <br /> <br />PART 3 - EXECUTION (Not Used) <br /> <br />06/05 <br /> <br />END OF SECTION <br /> <br />01410-2 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.