Laserfiche WebLink
<br />" <br /> <br />~ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />(j <br /> <br />IV <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />i' <br /> <br />LJ <br /> <br />n <br /> <br />~ <br /> <br />['1 <br /> <br />~ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />1\ <br /> <br />LJ <br /> <br />,\ <br /> <br />L.J <br /> <br />~ <br /> <br />LJ <br /> <br />PART 2 - PRODUCTS <br /> <br />2.01 TREE PROTECTION FENCING <br /> <br />A. <br /> <br />Tree protection fencing shall be: <br /> <br />1. <br /> <br />Mesh fence 6 ft. high minimum, with 4 "x4 "x6' pressure treated wood posts. <br /> <br />B. <br /> <br />Posts shall be spaced lOft. on center maximum. <br /> <br />C. <br /> <br />Fencing other than that specified above shall be subject to the approval of the Architect. <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 INST ALLA TION OF FENCING <br /> <br />A. <br /> <br />Prior to start of demolition work and clearing and grubbing operations, tree protection <br />fencing shall be installed in accordance with the following: <br /> <br />l. <br /> <br />Fencing shall be installed at the tree protection areas as directed by the <br />Landscape Architect. <br /> <br />2. <br /> <br />Fencing shall be located along the cut and fill lines staked by the project <br />surveyor and approved by the Architect and Owner. <br /> <br />3.02 ROOT PRUNING <br /> <br />A. <br /> <br />Where construction will be in close proximity to existing trees designated to remain, <br />roots shall be pruned. Proximity shall be as determined in the field by the Architect. Root <br />pruning shall be performed as specified in Section 02490 TREES, PLANTS AND <br />GROUND COVERS. <br /> <br />3.03 CLEARING WITHIN PROTECTION AREAS <br /> <br />A. <br /> <br />Selective clearing within tree protection areas shall only be performed when and as <br />directed by the Architect. <br /> <br />3.04 REMOVAL OF PROTECTION <br /> <br />06/05 <br /> <br />A. <br /> <br />Except as otherwise indicated or requested by Architect, temporary protection devices <br />and facilities installed during course of the work shall be removed only after all work <br />which may injure or damage trees and plants is completed. <br /> <br />END OF SECTION <br /> <br />01532-2 <br /> <br />03-4138.8 <br />