Laserfiche WebLink
<br />fl <br /> <br />L.J <br /> <br />fl <br /> <br />SECTION 01600 <br /> <br />L.J <br /> <br />" <br /> <br />MATERIAL AND EQUIPMENT <br /> <br />LJ <br /> <br />PART 1 - GENERAL <br /> <br />" <br /> <br />1.01 REQUIREMENTS INCLUDE <br /> <br />~ <br /> <br />A. Material and equipment incorporated into the Work: <br /> <br />n <br /> <br />LJ <br /> <br />1. <br /> <br />Conform to applicable specifications and standards. <br /> <br />n <br /> <br />2. <br /> <br />Comply with size, make, type and quantity specified, or as specifically approved <br />in writing by the Engineer. <br /> <br />LJ <br /> <br />" <br /> <br />3. <br /> <br />Manufactured and Fabricated Products: <br /> <br />LJ <br /> <br />L.J <br /> <br />d. <br /> <br />Design, fabricate and assemble in accord with the best engineering and <br />shop practices. <br />Manufacture like part of duplicate units to standard sizes and gauges, to <br />be interchangeable. <br />Two or more items of the same kind shall be identical, by the same <br />manufacturer. <br />Products shall be suitable for service conditions. <br />Equipment capacities, sizes and dimensions shown or specified shall be <br />adhered to unless variations are specifically approved in writing. <br /> <br />a. <br /> <br />n <br /> <br />b. <br /> <br />L.J <br /> <br />" <br /> <br />c. <br /> <br />n <br /> <br />e. <br /> <br />LJ <br /> <br />4. <br /> <br />Do not use material or equipment for any purpose other than that for which it is <br />designed or is specified. <br /> <br />n <br /> <br />L.J <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />n <br /> <br />L.J <br /> <br />A. <br /> <br />Section 01010: Summary of Work <br /> <br />" <br /> <br />B. <br /> <br />Section 01030: Special Project Procedures <br /> <br />L.J <br /> <br />C. Section 01340: Shop Drawings, Working Drawings and Samples <br /> <br />" <br /> <br />L.J <br /> <br />D. <br /> <br />Section 01720: Project Record Documents <br /> <br />fl 1.03 APPROV AL OF MATERIALS <br /> <br />L.J <br /> <br />A. <br /> <br />Only new materials and equipment shall be incorporated in the work. All materials and <br />equipment furnished by the Contractor shall be subject to the inspection and approval of <br />the Engineer. No material shall be delivered to the work without prior approval of the <br />Engineer. <br /> <br />n <br /> <br />~ <br /> <br />" <br /> <br />B. <br /> <br />Within 30 days after the effective date of the Agreement, the Contractor shall submit to <br />the Engineer, data relating to materials and equipment he proposes to furnish for the work. <br />Such data shall be in sufficient detail to enable the Engineer to identify the particular <br /> <br />LJ <br /> <br />fl <br /> <br />L.J <br /> <br />fl <br /> <br />06/05 <br /> <br />01600-1 <br /> <br />03-4138.8 <br /> <br />L.J <br />