Laserfiche WebLink
<br />n <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />" <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />r, <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />I' <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />r-'l <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />fl <br /> <br />L.J <br /> <br />PART 1- GENERAL <br /> <br />1.01 <br /> <br />SECTION 01700 <br /> <br />PROJECT CLOSEOUT <br /> <br />RELATED REQUIREMENTS <br /> <br />A. General provisions of Contract, including General and Supplementary Conditions. <br /> <br />B. <br /> <br />Warranty and bond submittal. <br /> <br />C. <br /> <br />Closeout submittals, warranties and bonds required for specific products of work. <br /> <br />1.02 SECTION INCLUDES <br /> <br />A. <br /> <br />Administrative and procedural requirements for project closeout. <br /> <br />2. <br /> <br />3. <br /> <br />1. <br /> <br />Inspection procedures. <br /> <br />Project record document submittal. <br /> <br />Final cleaning. <br /> <br />1.03 SUBSTANTIAL COMPLETION <br /> <br />06/05 <br /> <br />A. <br /> <br />Before requesting inspection for certification of Substantial Completion, complete the <br />following. List exceptions in the request. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />1. <br /> <br />If 100 percent-completion cannot be shown, include a list of incomplete items, <br />the value of incomplete construction, and reasons the Work is not complete. <br /> <br />Advise Owner of pending insurance change-over requirements. <br /> <br />Submit specific warranties, workmanship bonds, maintenance agreements, final <br />certifications and similar documents. <br /> <br />Obtain and submit releases enabling the Owner unrestricted use of the Work and <br />access to services and utilities; include occupancy permits, operating certificates, <br />and similar releases. <br /> <br />5. <br /> <br />Submit record drawings, maintenance manuals, and similar final record <br />information. <br /> <br />6. <br /> <br />Complete start-up testing of systems, and instruction of the Owner's operating <br />and maintenance personnel. Discontinue or change over and remove temporary <br />facilities from the site, along with construction tools, mock-ups, and similar <br />elements. <br /> <br />01700-1 <br /> <br />03-4138.8 <br />