My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br />I-.! <br />n <br /> C. <br />LJ <br />n <br />U <br />II <br />LJ <br />n <br />LJ <br />n <br />LJ D. <br />n <br />L..,I <br />n <br />LJ <br />n <br />U <br />II E. <br />LJ <br />II <br />LJ <br />n F. <br />u <br />n <br /> G. <br />LJ <br />n <br />LJ <br />n <br />U <br />n <br />LJ <br />n <br />LJ <br />n <br />LJ <br />n 06/05 <br />L-! <br /> <br />Record Specifications: Maintain one complete copy of the Project Manual, including <br />addenda, and one copy of other written construction documents such as Change Orders <br />and modifications issued in printed form during construction. <br /> <br />1. Mark these documents to show substantial variations in actual Work performed <br />in comparison with the text of the Specifications and modifications. <br /> <br />2. Give particular attention to substitutions, selection of options and similar <br />information on elements that are concealed or cannot otherwise be readily <br />discerned later by direct observation. <br /> <br />3. Note related record drawing information and Product Data. <br /> <br />Record Product Data: Maintain one copy of each Product Data submittal. <br /> <br />1. Mark these documents to show significant variations in actual Work performed <br />in comparison with information submitted. Include variations in products <br />delivered to the site, and from the manufacturer's installation instructions and <br />recommendations. <br /> <br />2. Give particular attention to concealed products and portions of the Work that <br />cannot otherwise be readily discerned later by direct observation. <br /> <br />3. Note related Change Orders and mark-up of record drawings and Specifications. <br /> <br />Record Sample Submitted: Immediately prior to the date or dates of Substantial <br />Completion, the Contractor will meet at the site with the Engineer and the Owner to <br />determine which of the submitted Samples that have been maintained during progress of <br />the Work are to be transmitted to the Owner for record purposes. Comply with delivery to <br />the Owner's Sample storage area. <br /> <br />Miscellaneous Record Submittals: Refer to other Specification Sections for requirements <br />of miscellaneous record-keeping and submittals in connection with actual performance of <br />the Work. <br /> <br />At Contract close-out, deliver one copy of Record Documents to Engineer for Owner. <br />Accompany submittal with transmittal letter in duplicate containing the following <br />information: <br /> <br />1. Date. <br /> <br />2. Project title and number. <br /> <br />3. Contractor's name and address. <br /> <br />4. Title and number of each Record Document. <br /> <br />5. Signature of Contractor or his authorized representative. <br /> <br />01700-4 <br /> <br />03-4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.