Laserfiche WebLink
<br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />II <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />u <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />r"' <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />L.J <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />5. <br /> <br />Maintenance procedures: <br /> <br />a. <br />b. <br /> <br />Routine operations <br />Guide to "trouble-shooting" <br />Disassembly, repair and reassembly <br />Adjustment and checking <br /> <br />c. <br />d. <br /> <br />6. <br /> <br />Manufacturer's printed operating and maintenance instructions <br /> <br />7. <br /> <br />List of original manufacturer's spare parts, manufacturer's current prices, and <br />recommended quantities to be maintained in storage. <br /> <br />8. <br /> <br />Other data as required under pertinent sections of specifications <br /> <br />D. <br /> <br />Prepare and include additional data when the need for such data becomes apparent <br />during instruction of Owner's personnel. <br /> <br />E. <br /> <br />Additional requirements for operating and maintenance data: Respective sections of <br />Specifications. <br /> <br />F. <br /> <br />Provide complete information for product specified. <br /> <br />1.08 SUBMITTAL SCHEDULE <br /> <br />06/05 <br /> <br />E. <br /> <br />A. <br /> <br />Submit two copies of preliminary draft of proposed formats and outlines of contents of <br />Operation and Maintenance Manuals within 30 days after Notice to Proceed. <br /> <br />1. <br /> <br />The Engineer will review the preliminary draft and return one copy with <br />comments. <br /> <br />B. <br /> <br />Submit two copies of completed data in final form no later than 30 days-following the <br />Engineer's review of the last shop drawing and submittal specified under Section 01340. <br /> <br />1. One copy will be returned with comments to be incorporated into final copies. <br /> <br />c. <br /> <br />Submit specified number of copies of approved data in final form directly to the offices <br />of the Engineer, Calvin, Giordano and Associates, Inc. within 30 calendar days of <br />product shipment to the project site and preferably within 30 days after the reviewed <br />copy is received. <br /> <br />D. <br /> <br />Submit six copies of addendum to the operation and maintenance manuals as applicable <br />and certificates as specified in paragraph 1.01B of Section 01030 within 30 days after <br />final inspection and plant start-up test. <br /> <br />Final Operation and Maintenance submittals shall be in large three ring binders <br />organized by specification Section and plainly marked per paragraph 1.04(C). <br /> <br />01730-6 <br /> <br />03-4138.8 <br />