My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />~ <br /> <br />,1 <br /> <br />~ <br /> <br />n <br /> <br />l..-J <br /> <br />n <br /> <br />LJ <br /> <br />r> <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />~ <br /> <br />n <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />" <br /> <br />'-' <br /> <br />r-, <br /> <br />u <br /> <br />[I <br /> <br />u <br /> <br />n <br /> <br />'LJ <br /> <br />n <br /> <br />~ <br /> <br />n <br /> <br />~ <br /> <br />(' <br /> <br />~ <br /> <br />3. <br /> <br />Provide and maintain pumps, well points, sumps, suction and discharge lines, and <br />other dewatering system components necessary to convey water away from <br />excavations. <br /> <br />G. <br /> <br />Stockpile satisfactory excavated materials where directed, until required for backfill or fill. <br />Place, grade and shape stockpiles for proper drainage. <br /> <br />H. <br /> <br />Excavation for Trenches: Dig trenches to the uniform width required for particular item to <br />be installed, sufficiently wide to provide ample working room. Provide minimum 6 in. <br />clearance on each side of pipe or conduit. <br /> <br />1. <br /> <br />Excavate trenches to depth indicated or required for indicated flow lines and <br />invert elevations. <br /> <br />2. <br /> <br />Where rock is encountered, carry excavation 6 in. below scheduled elevation and <br />backfill with a 6 in. layer of crushed stone or gravel prior to installation of pipe. <br /> <br />3. <br /> <br />For pipes or conduit 5 in. or less, excavate to indicated depths. Hand excavate <br />bottom cut to accurate elevations and support pipe or conduit on undisturbed soil. <br /> <br />4. <br /> <br />For pipes or conduit 6 in. or larger, tanks and other work indicated to receive <br />subbase, excavate to subbase depth indicated, or, if not otherwise indicated, to 6 <br />in. below bottom of work to be supported. <br /> <br />5. <br /> <br />Except as otherwise indicated, excavate for exterior water-bearing piping so top of <br />piping is minimum 3'-6" below finished grade. <br /> <br />6. <br /> <br />Grade bottoms of trenches as indicated, notching under pipe bells to provide solid <br />bearing for entire body of pipe. <br /> <br />I. <br /> <br />Do not backfill trenches until tests and inspections have been made and backfilling <br />authorized by Engineer. <br /> <br />3.02 COMPACTION <br /> <br />06/05 <br /> <br />A. <br /> <br />Areas to be compacted shall be moistened and compacted by either rolling, tamping or any <br />other approved method by the Engineer in order to obtain a minimum 90% standard <br />proctor density for the foundation, bedding, haunching, and initial backfill, and a <br />minimum of 85% standard proctor density for the final backfill. The Contractor shall <br />inspect all compacted areas prior to further construction operations to ensure that <br />satisfactory compaction has been obtained. All backfill adjacent to structures and pipes <br />shall be compacted to a density of not less than 100 percent of the maximum standard <br />proctor density. If density tests are required~ such tests shall be made as directed by the <br />Engineer at the expense of the Contractor. The Contractor shall instruct the testing <br />laboratory to forward copies of all test reports to the Engineer. Written notice from the <br />Contractor shall precede completion of compaction operations by at least two working <br />days. <br /> <br />B. <br /> <br />Moisture Control: Where sub grade or layer of soil material must be moisture conditioned <br />before compaction, uniformly apply clean water to surface of subgrade, or layer of soil <br /> <br />02200-3 <br /> <br />03-4138.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.