Laserfiche WebLink
<br />" <br /> <br />LJ <br /> <br />j, <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />Il <br /> <br />u <br /> <br />n <br /> <br />L; <br /> <br />n <br /> <br />L.,I <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />fl <br /> <br />LJ <br /> <br />II <br /> <br />'---1 <br /> <br />r' , <br /> <br />LJ <br /> <br />" <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />,', <br /> <br />LJ <br /> <br />" <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 PREPARATION <br /> <br />A. <br /> <br />All new installation shall be laid out by the contractor in accordance with the construction <br />plans. <br /> <br />3.02 INSTALLATION <br /> <br />A. <br /> <br />Fence posts shall be set in accordance with the spacings shown in Table 2, plus or minus <br />1/2", depending on the nominal span specified. <br /> <br />jSpan j6' Nominal (73-1/4" Rail) "~8' Nominal (92,,"'R;il)-"'-------""-: <br />Ip~~t si~~ ,'..,.. ..'...'.'...''''.--..--]2='1"/2;,'''-...---..13.;;'''...-... .'.'.'12=i/2";;-",.", '.., ''''[3;;'''' '" ,,,,,,,,.,,, ""."", <br />~~~!"'~~~.~~~~~~~'S?:~:,=:~__.,'"'"""'J??~ ~~~';~=~=:~:~~"'J77 -11~'~::::-.==.-_w~195_1 /2~'_.m~.___.-"~~6;;. <br />Table 2 - Post Spacing Requirements <br /> <br />Gate posts shall be spaced according to the gate openings specified in the construction <br />plans. The "Earthwork" and "Concrete" sections of this specification shall govern post <br />base material requirements. Aegis Plus™ panels shall be attached to posts using <br />mechanically fastened panel brackets supplied by the manufacturer. <br /> <br />3.03 CLEANING <br /> <br />A. The contractor shall clean the jobsite of excess materials; post-hole excavations shall be <br />scattered uniformly away from posts. <br /> <br />END OF SECTION <br /> <br />06/05 <br /> <br />02444-4 <br /> <br />03-4138.B <br />