Laserfiche WebLink
<br />n <br /> <br />L--1 <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />'I <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />u <br /> <br />(I <br /> <br />LJ <br /> <br />i' <br /> <br />"-J <br /> <br />II <br /> <br />LJ <br /> <br />i' <br /> <br />LJ <br /> <br />Ii <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />u <br /> <br />38. Samples-Physical examples of materials. <br />equipment, or workmanship that are representative of <br />some portion of the Work and which establish the <br />standards by which such portion of the Work will be <br />judged. <br /> <br />39. Shop Drawings--A11 drawings, diagrams, illustra- <br />tions, schedules, and other data or information which are <br />specifically prepared or assembled by or for CON- <br />TRACTOR and submitted by CONTRACTOR to <br />illustrate some portion of the Work. <br /> <br />40. Site--Lands or areas indicated in the Contract <br />Documents as being furnished by OWNER upon which <br />the Work is to be performed, including rights-of-way and <br />easements for access thereto, and such other lands <br />furnished by OWNER which are designated for the use of <br />CONTRACTOR. <br /> <br />41. Specifications--That part of the Contract <br />Documents consisting of written technical descriptions of <br />materials, equipment, systems, standards, and <br />workmanship as applied to the Work and certain <br />administrative details applicable thereto. <br /> <br />42. SubconJractor--An individual or entity having a <br />direct contract with CONTRACTOR or with any other <br />Subcontractor for the performance of a part of the Work <br />at the Site. <br /> <br />43. Substantial Completion-The time at which the <br />Work (or a specified part thereof) has progressed to the <br />point where, in the opinion of ENGINEER., the Work (or <br />a specified part thereof) is sufficiently complete, in <br />accordance with the Contract Documents, so that the <br />Work (or a specified part thereof) can be utilized for the <br />purposes for which it is intended. The terms <br />"5ub~flmtiany complete" and "substantially completed" as <br />applied to all or part of the Work refer to Substantial <br />Completion thereof. <br /> <br />44. Supplememary Conditions--That part of the <br />Contract Documents which amends or supplements these <br />General Conditions. <br /> <br />45. Supplier-A manufacturer, fabricator, supplier, <br />distributor, materialman, or vendor having a direct <br />contract with CONTRACTOR or with any Subcontractor <br />to furnish materials or equipment to be incorporated in <br />the Work by CONTRACTOR or anr Subcontractor. <br /> <br />46. Underground Facilities-All underground <br />pipelines, conduits, ducts, cables, wires, manholes, <br />vaults, tanks, tunnels, or other such- facilities or <br />attachments, and any encasements containing such <br />facilities, including those that convey electricity, gases, <br /> <br />00700 - 8 <br /> <br />steam, liquid petroleum products, telephone or other <br />communications, cable television, water, wastewater, <br />storm water, other liquids or chemicals, or traffic or <br />other control systems. <br /> <br />47. Unit Price Work--Work to be paid for on the <br />basis of unit prices. <br /> <br />48. Work--The entire completed construction or the <br />various separately identifiable parts thereof required to be <br />provided under the Contract Documents. Work includes <br />and is the result of performing or providing all labor, <br />services, and documentation necessary to produce such <br />construction, and furnishing, installing, and incorporating <br />all materials and equipment into such construction, all as <br />required by the Contract Documents. <br /> <br />49. Work Change DireClive-A written statement to <br />CONTRACTOR issued on or after the Effective Date of <br />the Agreement and signed by OWNER and recommended <br />by ENGINEER ordering an addition, deletion,or revision <br />in the Work, or responding to differing or unforeseen <br />subsurface or physical conditions under which the Work <br />is to be performed or to emergencies. A Work Change <br />Directive will not change the Contract Price or the <br />Contract Times but is evidence that the parties expect that <br />the change ordered or documented by a Work Change <br />Directive will be incorporated in a subsequently issued <br />Change Order following negotiations by the parties as to <br />its effect, if any, on the Contract Price or Contract <br />Times. <br /> <br />50. Written AmendmenJ-A written statement <br />modifying the Contract Documents, signed by OWNER <br />and CONTRACTOR- on or after the- Effective Date of the <br />Agreement and normally dealing with the nonengineering <br />or nontechnical rather than strictly construction-related <br />aspects of .the Contract Documents. <br /> <br />1.02 Terminology <br /> <br />A. [nJenJ of Certain Terms or Adjectives <br /> <br />1. Whenever in the Contract Documents the terms <br />.. as allowed," .. as approved," or terms of like effect or <br />import are used, or the adjectives "reasonable, .. <br />"suitable." "acceptable," "proper," "satisfactory," or <br />adjectives of like effect or import are used to describe an <br />action or determination of ENGINEER as to the Work, it <br />is intended that such action or determination will be solely <br />to evaluate, in general, the completed Work for <br />c;ompliance with the requirements of and information in <br />the Contract Documents and conformance with the design <br />concept of the completed Project as a functioning whole <br />as shown or indicated in the Contract Documents (unless <br />there is a specific statement indicating otherwise). The <br />