Laserfiche WebLink
<br />" <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />l.-.! <br /> <br />n <br /> <br />l.-.! <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />L.J <br /> <br />II <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />r, <br /> <br />L.J <br /> <br />B. If ENGINEER considers it necessary or advisable <br />that covered Work be observed by ENGINEER or inspected <br />or tested by others, CONTRACTOR, at ENGINEER's <br />request, shall uncover, expose, or otherwise make available A. If within one year after the date of Substantial <br />for observation, inspection, or testing as ENGINEER may Completion or such longer period of time as may be <br />require, that portion of the Work in question, furnishing all prescribed by Laws or Regulations or by the terms of any <br />necessary labor, material, and equipment. If it is found that applicable special guarantee required by the Contract <br />such Work is defective, CONTRACTOR shall pay all Documents or by any specific provision of the Contract <br />Claims, costs, losses, and damages (including but not limited Documents, any Work is found to be defective, or if the <br />to all fees and charges of engineers, architects, attorneys, and repair of any damages to the land or areas made available for <br />other professionals and all court or arbitration or other CONTRACTOR's use by OWNER or permitted by Laws and <br />dispute resolution costs) arising out of or relating to such Regulations as contemplated in paragraph 6.11.A is found to <br />uncovering, exposure, observation, inspection, and testing, be defective, CONTRACTOR shall promptly. without cost <br />and of satisfactory replacement or reconstruction (including to OWNER and in accordance with OWNER's written <br />but not limited to all costs of repair or replacement of work instructions: (i) repair such defective land or areas, or (ii) <br />of others); and OWNER shall be entitled to an appropriate correct such defective Work or, if the defective Work has <br />decrease in the Contract Price. If the parties are unable to been rejected by OWNER, remove it from the Proj~.and <br />agree as to the amount thereof, OWNER may make a Claim replace.it with Work that is not defective, and (ill) satisfac- <br />therefor as provided in paragraph 10.05. If, however, such .....torily correct or.repair.or:remove~and replace any damage to <br />Work is not found to be defective, CONTRACTOR shall be other:Work, to the .work-o[others or other land or areas <br />allowed anjncrease in the Contract Price or an extension-of . ..resulting therefrom. ..1LC.ONTRACTOR does not promptly <br />. the Contract Times (or Milestones), or both, directlyattribut- comply with the terms of such instructions, or in an <br />able to such uncovering, exposure, observation, inspection, emergency where delay would cause serious risk of loss or <br />testing, replacement, and reconstruction. If the parties are damage, OWNER may have the defective Work corrected or <br />unable to agree as to the amount or extent thereof, repaired or may have the rejected Work removed and <br />CONTRACTOR may make a Claim therefor as provided in replaced, and all Claims, costs, losses. and damages <br />paragraph 10.05. (including but not limited to all fees and charges of <br />engineers, architects, attorneys, and other professionals and <br />all court or arbitration or other dispute resolution costs) <br />arising out of or relating to such correction or repair or such <br />removal and replacement (including but not limited to all <br />costs of repair or replacement of work of others) will be paid <br />by CONTRACTOR. - <br /> <br />E. If any Work (or the work of others) that is to be <br />inspected, tested, or approved is covered by CONTRACTOR <br />without written concurrence of ENGINEER. it must, if <br />requested by ENGINEER, be uncovered for observation. <br /> <br />F. Uncovering Work as provided in paragraph 13.03.E <br />shall be at CONTRACTOR's expense unless CON- <br />TRACTOR has given ENGINEER timely notice of <br />CONTRACTOR's intention to cover the same and ENGI- <br />NEER has not acted with reasonable promptness in response <br />to such notice. <br /> <br />13.04 Uncovering Work <br /> <br />A. If any Work is covered contrary to the written <br />request of ENGINEER, it must, if requested by ENGINEER, . <br />be uncovered for ENGINEER's observation and replaced at <br />CONTRACTOR's expense. <br /> <br />13.05 <br /> <br />OWNER May Stop the Work <br /> <br />A. If the Work is defective, or CONTRACTOR fails to <br />supply sufficient skilled workers or suitable materials or <br />equipment, or fails to perform the Work in such a way that <br />the completed Work will conform to the Contract <br />Documents. OWNER may order CONTRACTOR to slOp the <br />Work, or any portion thereof, until the cause for such order <br />has been eliminated; however, this right of OWNER to stop <br /> <br />the Work shall not give rise to any duty on the part of <br />OWNER to exercise this right for the benefit of <br />CONTRACTOR, any Subcontractor. any Supplier, any other <br />individual or entity, or any surety for. or employee or agent <br />of any of them. <br /> <br />13.06 Correction or Removal of Defective Work <br /> <br />A. CONTRACTOR shall correct all defective Work, <br />whether or not fabricated, installed, or completed, or, if the <br />Work has been rejected by ENGINEER, remove it from the <br />Project and replace it with Work that is not defective. <br />CONTRACTOR shall pay all Claims, costs, losses, and <br />damages (including but not limited to all fees and charges of <br />engineers, architects, attorneys, and other professionals and <br />all court. or arbitration or other dispute resolution costs) <br />. arising out of or relating to.such correction or removal <br />. (including but not limited to all costs of repair or. replacement <br />of work of others). <br /> <br />13.07 <br /> <br />Correction Period <br /> <br />B. In special circumstances wher~ a particular item of <br />equipment is placed in continuous service before Substantial <br />Completion of all the Work, the correc~::>D period for that <br /> <br />00700 - 35 <br />