My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-829
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:31 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-829
Date (mm/dd/yyyy)
09/08/2005
Description
– Award Bid 05-06-01/Agmt Fence Masters, Median Fencing Improvements.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />n <br /> <br />L.J <br /> <br />(I <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />SECTION 00800 <br /> <br />SUPPLEMENTARY CONDITIONS <br /> <br />The following supplements modify, change from or add to the Standard General Conditions of the <br />n Construction Contract, EJCDC Document 1910-8, 1996 Edition. Where any Article of the General <br />LJ Conditions is modified or any Paragraph, Subparagraph or Clause thereof is modified or deleted by these <br />supplements, the unaltered provisions shall remain in effect. <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br /> <br />Add the following sentence to 1.28 Notice of Award: "When requested by OWNER, the Notice of Award <br />may be issued by the ENGINEER." <br /> <br />Add the following sentence to 1.29 Notice to Proceed: "When requested by OWNER, the Notice to <br />Proceed may be issued by ENGINEER." <br /> <br />Add the following terms after Paragraph 1.50: <br /> <br />LJ 1.51 ARCHITECT/ENGINEER - The person, firm or corporation named as the ENGINEER in the <br />Agreement. <br /> <br />n <br /> <br />L; 1.52 Provide - As used in the Project Manual, means to furnish and install, complete and ready for <br />intended use. <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />II <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />L.J <br /> <br />1.53 Product - As used in the Project Manual, includes materials, fabrications, systems and equipment. <br /> <br />1.54 Project Manual - The volume of written construction documents, including the Bidding Documents, <br />sample forms, and the Contract Documents, such as the Conditions of the Contract and the Specifications. <br /> <br />ARTICLE 2 - PRELIMINARY MA TIERS <br /> <br />Add the following to Paragraph 2.01.: "If the Work is to be commenced prior to execution of the <br />Agreement in response to a letter of intent, CONTRACTOR shall, prior to commencement of the Work, <br />submit evidence satisfactory to OWNER that such bonds will be furnished." <br /> <br />In the first line of Paragraph 2.02., change the term "...ten..." to read "...six...". <br /> <br />Delete Paragraph 2.03. and replace with the following: <br /> <br />2.03. The date of commencement of the Work is the date established in a Notice to Proceed. If there is <br />no Notice to Proceed, it shall be the date of the OWNER-CONTRACTOR Agreement or such other date <br />as may be established therein. <br /> <br />Add the following to Paragraph 2.05.: <br /> <br />D. CONTRACTOR shall perform no portion of the Work at any time without Contract Documents or, <br />where specified, approved Shop Drawings for such portion of the Work. <br /> <br />06/05 <br /> <br />00800-1 <br /> <br />03-4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.