My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-858
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2011 11:30:04 AM
Creation date
1/25/2006 1:58:02 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-858
Date (mm/dd/yyyy)
11/17/2005
Description
– Apply for/Receive/Expend DEP Grant of $400,000 for Central Island Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />of a residential area of about 96 acres, bounded from west to east by North Bay Road and Collins Avenue, <br />and from south to north by NE 174 Street and NE 183 Street. <br /> <br />The proposed storm drainage improvements involve the construction of ex-filtration pIpmg systems <br />including the following main elements: <br />. Drainage Structures (91 Units) <br />. Manholes (37 Units) <br />. Storm Sewer Collection System (11,900 Linear Feet) <br />. Ex-filtration System (6,100 Linear Feet), <br />. Drainage Wells (24 units) <br />. Milling and Resurfacing (35,421 Square Yards) <br /> <br />The project governing standards and specifications are: <br />. 2004 Florida Department of Transportation Roadway and Traffic Design Standards <br />. 2004 Standard Specifications for Road and Bridge Construction <br />. Miami-Dade County Public Works Manual Parts I and II. <br /> <br />The implementation of the project will be as follows: The project final design plans are completed. Bids <br />will be due by January 2005. Construction is to be completed in twelve (12) months. The preliminary <br />construction cost estimate for this project is $ 5million. <br /> <br />The City shall be responsible for the satisfactory completion of all work under this Statement of Work. This <br />Statement ofW<?rk will focus on activities that include the following tasks: <br /> <br />Task 1: <br />Task 2: <br />Task 3: <br />Task 4: <br /> <br />Engineering Design and Permitting <br />Preparation of Bid Documents and Specifications <br />Construction, Construction Monitoring/Monthly Reports <br />Construction Certification <br /> <br />The Project will meet the regulatory requirements of all government agencies with permitting jurisdiction. <br /> <br />4.0 WORK BREAKDOWN STRUCTURE <br /> <br />At the end of each task, the City shall deliver Three (3) copies of the task deliverables to the District. The <br />District shall distribute the copies to the FDEP for its information and use. The City shall also provide a <br />summary of the project including estimated cost to the District upon completion of Task 3. The District <br />shall distribute the project summary including estimated cost to the designated coordinator for the Local <br />Mitigation Strategies Group for its infoTIpation and use. <br /> <br />Project Management <br /> <br />The City is responsible for project management, budget management and quality control. The City is <br />responsible for reviewing and approving deliverables to ensure that the project objectives are met. <br /> <br />$hB3 <br /> <br />Page 2, Exhibit "A", Statement of Work. OT050655 <br />
The URL can be used to link to this page
Your browser does not support the video tag.