Laserfiche WebLink
<br />J. -:r:U..L J. I.:.J\:JL.. <br /> <br />['-0:..1.1 <br /> <br />December 21 , 2005 <br /> <br />Mr. Jay Zayas <br />Siltek Group <br />4403 Dogwood Circle <br />Weston, Florida 33331 <br /> <br />Tel: 954-217-6829 <br /> <br />Fax: 954-217-1728 <br /> <br />Subject: <br /> <br />Proposal for Pile Load Test and <br />Pile Installation Monitoring <br />Proposed Gymnasium at 2- Acre Park <br />181 st Drive and North Bay Road <br />Sunny Isles Beach, Florida <br /> <br />Dear 1\1r. Zayas: <br /> <br />Nutting Engineers of Florida, Inc. is pleased to present this proposal for performing augercast <br />pile load test and installation monitoring for the Proposed Gyninasium and Recreational Park <br />project in Sunny Isles Beach, Florida. <br /> <br />We understand that approximately 205 augercast piles will be installed for this project. We <br />understand that a pile load test will be performed in accordance Vv1.th the South Florida Building <br />Code to twice the design load. Nutting Engineers previously perfonned a geotechnical <br />exploration for this project, and our findings and recommendations are presented in a report <br />dated Jillle 16,2004. <br /> <br />Based on our understanding of the project, \ve propose the following scope of work and fee <br />schedule. <br /> <br />SCOPE OF WORK <br /> <br />We ...vill provide full-time monitoring of the installation of the test/reaction piles and production <br />augercast piles, provide instrumentation and direct the pile load test. Based on the results of the <br />pile load test, we will provide final installation criteria for the production piles. A log of each <br />pile will be kept and will include depth, size, grout take, 'steel reinforcement placed, and other <br />pertinent information. We have assumed approximately 20 piles per day ,",viII be installed during <br />production pile installation. <br />