My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-893
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-893
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:42 AM
Creation date
7/26/2006 4:53:16 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-893
Date (mm/dd/yyyy)
02/16/2006
Description
Agreement w/ RAFAEL BARRIOS, Artist, SCULPTURE FOR TOWN CENTER PARK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2. Two 4x5 color transparencies. <br /> <br />3. Four 8x I 0 black and white photographs. <br /> <br />Slides and photographs shall be of acceptable professional quality as determined by the <br />Contract Administrator. <br /> <br />In addition to the photographic documentation referenced above, ARTIST shall also provide <br />Contract Administrator with any and all sketches, drawings, construction documents (if <br />applicable), and as-built plans (if applicable) showing the completed Work. <br /> <br />2.5 Upon completion of the Project, ARTIST shall provide Contract Administrator with a <br />detailed written schedule and instructions for the routine care, maintenance, and preservation <br />specific to the Project, as set forth in Exhibit C, Cataloguing Form, attached and made a part <br />hereof. <br /> <br />2.6 ARTIST shall be responsible for the quality and timely completion of the Project. The <br />ARTIST shall be responsible for designing the artwork so that it can be constructed without <br />exceeding the approved overall budget. <br /> <br />2.7 ARTIST agrees that all Work shall comply with all applicable Federal, State, Miami-Dade <br />County, and CITY of Sunny Isles Beach laws, ordinances, codes and regulations. ARTIST <br />shall be solely responsible for obtaining any required approvals and permits for the Project, <br />although ARTIST shall not be required to pay fees charged by the CITY for such approvals <br />and permits. <br /> <br />2.8 The ARTIST shall not make any public information release in connection with the Project <br />and/or the Work performed pursuant to this Agreement without the prior written permission <br />of the Contract Administrator. <br /> <br />2.9 The ARTIST shall take all necessary steps to coordinate the Work with any ongoing work of <br />the CITY, or any third party under the direction and control of the CITY, on or near the Site. <br /> <br />2.10 While ARTIST is solely responsible for the execution, fabrication, transportation, inspection <br />and/or installation of the Project, the following provisions shall apply: <br /> <br />a. The Contract Administrator shall notify ARTIST of the CITY'S, or any other <br />contractor's under the direction and control of the CITY, construction schedules in and <br />around the area where the Work is to be performed or installed, if they are known by <br />the CITY. The ARTIST shall perform the Work in a manner and time so as not to <br />cause interference with any of the operations of the CITY or such third party <br />contractor. In the event of conflict between the schedules of a third party contractor, <br />CITY, and ARTIST, the conflict will be resolved by the Contract Administrator, and <br />the Contract Administrator's decision and resolution as to same shall be binding upon <br />ARTIST. <br /> <br />:5') j ?>.. <br />. J" <br />\..: . t~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.