My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-959
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-959
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:51 AM
Creation date
8/15/2006 1:02:11 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-959
Date (mm/dd/yyyy)
07/20/2006
Description
Accept. Land Value for St. Tropez (16690 Collins) - Quinlivan Appraisal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Florida Power & Light Company <br /> <br />F=PL <br /> <br />February 24, 2006 <br /> <br />Diego Medina - 40 CONSTRUCTION, LLC <br />President <br />3211 Ponce de Leon Blvd., Ste 301 <br />Coral Gables, FL. 33134 <br /> <br />Re: ST. TROPEZ ON THE BAY - 200 Sunny Isles Blvd <br />~ <br /> <br />Dear Mr, Medina: <br /> <br />Pursuant to your request for a binding cost estimate, and your payment of $0,00 for the non-refundable engineering deposit, our <br />engineering cost estimates have been completed. The binding estimate amount, known also as CIAC (Contribution In Aid of <br />Construction), required by FPL for converting those overhead electric distribution facilities described in your letter to underground, is <br />$142,962,00. This CIAC amount is based on the design shown on the attached FPL engineering drawings dated 2/10/2006, revision <br />O. Any non-FPL requested modifications to these drawings will be billed at an hourly rate of $70.00, <br /> <br />This estimate does not include restoration of property affected by the conversion; describing, securing, and recording of easements; <br />clearing of trench routes; or rearrangement of customer service entrances. This estimate includes no costs you may incur from other <br />utilities/pole licensees affected by the conversion. These aspects, as stated before, are the responsibility of the applicant. <br /> <br />To fully account for all expenses which are part and parcel of the full cost of conversion and thereby ensure that other FPL customers <br />do not pay for costs associated with your conversion (and likewise you theirs), FPL requires that the entity or person requesting the <br />conversion agree to certain terms and conditions. The following identifies some, but is not limited to, the terms and conditions <br />required of the applicant before commencing with the underground conversion of the overhead electrical distribution system. The <br />applicant must: <br /> <br />a. enter into agreements that will accommodate the conversion of other pole licensees (e,g. Tel. Co., CATV); <br /> <br />b. describe, secure, and record all easements (along with opinion of title that they are valid), at no cost to FPL, necessary to <br />accommodate the underground distribution system; <br /> <br />c. secure all necessary permits before the commencement of construction. <br />d, be responsible for the costs associated with maintaining service to any affeCted customer who refuses to rearrange his/her <br />service entrance to accept service from the underground distribution system; <br />e. agree to be responsible for all restoration of property affected by the installation of the underground system; <br />f. protect FPL from any claim or suit regarding restoration or property affected by the conversion; and <br />g. agree to clear easements of trees and all obstructions that might conflict with construction of the underground system. <br /> <br />This binding cost estimate is valid for 180 days, providing there is no work scope change. The 180 day window can be extended for a <br />reasonable period of time for good cause. Should you request FPL to perform the conversion, please sign and return the attached <br />Underground Facilities Conversion Agreement. If you do not request the conversion to be performed, or if the Agreement is not <br />executed and its terms and conditions complied within the specified time period, your $0,00 engineering deposit will be forfeited and <br />the estimate withdrawn. If the agreement is executed and its terms and conditions complied within that time period, FPL will apply the <br />deposit toward the CIAC amount you would owe for the conversion. The remaining amount of $142,962,00 must be paid prior to <br />commencement of construction by FPL. <br /> <br />I look forward to hearing from you. Please contact me at (305) 987-1626 if you have any questions. <br /> <br />SinC,~eIY,'., t4JJ ~ tJI' <br />'7- ~ I' i <br />/ ".... " I <br />t...--..--.f'. ........, I <br /> <br />Lawrence Howell <br />Project Manager <br /> <br />an FPL Group Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.