Laserfiche WebLink
<br />. <br /> <br /> Description QTY UNIT Unit Cost Extension <br /> General <br />I <br /> Mobilization per FOOT item 101-1 <br />1 (<5%) 1 LS $ 4.644.22 $ 4.644.22 <br /> Maintenance of Traffic Per Plans <br />2 1 LS $ 3.250.00 $ 3,250.00 <br /> SUBTOTAL GENERAL <br /> $ 7,894.22 <br /> Electrical <br />II <br /> Installation of City Furnished Single <br />3 Pole Mounted Fixture Assembly 17 EA $ 749.00 $ 12,733.00 <br /> Installation of City Furnished Twin <br />4 Pole Mounted Fixture Assembly 0 EA $ - $ - <br /> Precast Concrete Base <br />5 17 EA $ 450.00 $ 7,650.00 <br /> Service Rack <br />6 1 EA $ 9,999.00 $ 9,999.00 <br /> Pull Boxes <br />7 17 EA $ 693,00 $ 11,781.00 <br /> FPL Furnished Handhole <br />8 1 EA $ 195.00 $ 195,00 <br /> Conduit and Wire to include <br />9 Pavement and Site Restoration 1 LS $ 106.142.00 $ 106.142.00 <br /> SUBTOTAL ELECTRICAL <br /> $ 148,500.00 <br /> <br />TOTAL BASE BID (ITEMS I thru II) <br /> <br />$ 156,394.22 <br />