Laserfiche WebLink
<br /> <br />I <br />.....1.. <br /> <br />Engineering <br /> <br />Construction Engineering <br />& Inspection <br /> <br />Municipal Engineering <br /> <br />Transportation Planning <br />& Traffic Engineering <br /> <br />Surveying & Mapping <br /> <br />Planning <br /> <br />landscape Architecture <br />& Environmental Services <br /> <br />Construction Services <br /> <br />Indoor Air Quality <br /> <br />Data Technologies <br />& Development <br /> <br />Emergency Management <br />Services <br /> <br />1800 Eller Drive, Suite 600 <br />Fort lauderdale, FL 33316 <br />Phone: 954,921.7781 <br />Fax: 954,921.8807 <br /> <br />www.calvin-giordano.com <br /> <br />Fort Lauderdale <br /> <br />I <br />"..1 <br />i: : <br />j -- --! i : t <br />r 'alvi~,Gidrdanp & Associates. Inc. <br />IEjX C EI P T I! 0 N A L $ 0 L UTI 0 N S <br /> <br />.' 'I 1 <br />I <br />September 11, 2006 <br /> <br />I <br />'f <br /> <br />I <br /> <br /> <br />SEP 1 2 2006 <br /> <br />ctty of Sunny lele8 aeach <br />OffiCI of the City Manager <br /> <br />Mr..John A. Szerlag <br />CitY Manflger <br />CrTIY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />Re: Work Authorization No. 85 <br />Central Island Drainage and Street Improvements <br />Hydrogeological Investigation <br />CGA Proposal No. 03-4122.4 <br /> <br />Dear Mr. Szerlag: <br /> <br />Enclosed for your review and approval is Work Authorization No. 85 for the above- <br />referenced project. We have also included a location map showing the vicinity of the <br />work to be performed as described within the scope of services. The proposed scope of <br />work is required to provide a reasonable assurance investigation as well as determining <br />the flow rates and capacity of the proposed wells prior to the installation of the proposed <br />drainage system. <br /> <br />The scope of work includes testing, traffic control and drilling of three test wells. The <br />work will be performed by Langan Engineering & Environmental Services and it is very <br />important for this task to be performed as soon as possible to allow the permitting and <br />subsequently the bidding to continue on schedule. <br /> <br />Should you have any questions concerning this matter, please feel free to contact me at <br />your convenience. <br /> <br />Sincerely, <br /> <br />CALVIN, GIORDANO & ASSOCIATES, INC. <br />~&o/J~ <br /> <br />Shelley Eichner, AICP <br />Vice-President <br /> <br />Ii <br />I <br />I <br />T <br />!, <br />:! <br />I <br />I, <br />I <br />, <br />I <br /> <br />! <br />I <br />! <br />i <br />I <br />, <br />I <br />i <br /> <br />SH/jm <br /> <br />Enclosures <br /> <br />P:\Proposals\2003 Additional Services\03-4122.4 SIB Hydrogeological Investigation.doc <br /> <br />Attachment "A" <br /> <br />SIB <br /> <br />West Palm Beach <br /> <br />Orlando <br /> <br />Fort Pierce <br /> <br />Homestead <br />