My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2006-1024
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2006
>
Reso 2006-1024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 2:36:17 PM
Creation date
2/21/2007 1:02:49 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2006-1024
Date (mm/dd/yyyy)
12/14/2006
Description
1st Amd to Agmt w/ CALVIN GIORDANO Construction Mgr Active Park Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work Aulhofllatlon No 60 <br />August 31. 2005 <br />Calvin, Giordano & Associates, Inc. Proposal No. 05-5388 <br /> <br />CITY OF SUNNY ISLES BEACH <br />181" Drivc Activc Park -Inspection Scn'ices <br /> <br />PROJECT DESCRIPTION: <br /> <br />Inspection services for the construction of the 181 sl Drive Activc Park in the City of Sunny Islcs <br />Beach. <br /> <br />I. SCOPE OF SERVICES <br /> <br />The serviccs below have bccn cstimatcd for up to 195 hours, anything abovc that will requirc <br />additional agreements. <br /> <br />Contract Administration Services: <br /> <br />A. Meeting with Contractor and appropriatc regulatory agencies when requested and <br />nccessary for consultation or conferences in regard to construction of the project. <br />R. Issue interprctations and clarifications of the Contract Documents, and evaluatc rcquested <br />dcviations from the approved design or spccification. In connection thcrewith, revicw, <br />prepare and process any work change directives or change ordcrs requested by the <br />Contractor or City. <br />C. Review shop drawings, samples and other data which the Contractor is required to submit, <br />but only for confonnance with the design conccpt of the projcct and compliance with thc <br />specifications. <br />D. Review, approvc and process pay request. <br />E. Make daily inspections for compliance with plans and spccifications. Make interim <br />inspcctions for substantial completion; approve pay requcsts and perform a final <br />inspection to detemline if the work has been complctcd in reasonablc conformance with <br />the intent of the Contract Documcnts. <br />F. Review as-buiIts provided by the Contractor. <br /> <br />Inspection Scrvices: <br /> <br />A. Monitor construction of thc work and verify the construction is within rcasonable <br />confonnancc with the intent of the Contract Documents. <br />B. Provide inspection reports to the Owner and rcgulatory agencies, as requircd. <br />C. Regular inspections of the site to ensure schedules are followed and City standards are met <br />(up to 750 hours of inspection time). <br />D. Vcrify that pay rcquest quantities match the work performed and Contact Documents. <br /> <br />P:\Proposals\2005 Proposals\05-5388 IS 1st Dr. Active Park. Insp. Services doc <br /> <br />SIB <br />SIB <br />
The URL can be used to link to this page
Your browser does not support the video tag.