My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1073
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:07 AM
Creation date
6/20/2007 1:33:20 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1073
Date (mm/dd/yyyy)
04/19/2007
Description
Apply for Florida Highway Beautification Grant from FDOT $300,000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />650.050.10 <br />ENVIRONM(NT AI. VlANAGEMENT <br />01/0.1 <br />PiliJn2ol.1 <br /> <br />The following information is for use by the Cauncil to score and rank the grant applications. <br /> <br />County: <br /> <br />City: <br />Local Name: <br /> <br />U.S./ S.R. II: <br />Length 01 Prajeet: <br /> <br />(Miles or Feet) <br /> <br />From: <br /> <br />(Mus! indicale mileposts and visible landmarks, i.e. intersections) <br /> <br />To: <br /> <br />(Must indicate mileposts and visible landmarks, i.e. intersections) <br /> <br />S_umlllill'Y.9LEiigible Grant Proiec.u;osts (to be paid for by the Grant): <br />Sprinkler/irrigalion system (purchase/install) <br /> <br />Planlmaterials, ferlilizer, soil amendmenls <br /> <br />Labor lor installation 01 the plantings <br /> <br />j:STIMATED TOTAL ELIGIBLE GRANT COSTS: <br /> <br />$ <br />$ <br />$ <br />$ <br /> <br />0.00 <br />0.00 <br />0.00 <br /> <br />0.00 <br /> <br />Water (trucked or irrigation system) <br />Labor lor installation (include estimate of volunteer labor costs) <br /> <br />Summary...Qf..l\J2olicant Matching_Proiect CosJ~ (Local Gavernment Share. not including continuing maintenance): <br />Design fee (max 10% Total Project Cost) $ <br /> <br />Plant materials $ <br />$ <br /> <br />$ <br /> <br />S <br /> <br />Establishment periad costs (labor etc.) <br /> <br />Other (identify) <br /> <br />s <br /> <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />ESTlMAJED TOTAL APPLICANT MATCHING COSTS.; <br /> <br />$ <br /> <br />0.00 <br /> <br />.I,:STIM,t\TED TOTAL PROJECLc_OST: <br /> <br />$ <br /> <br />0.00 <br /> <br />ANNUAL MAINTENANCE: The following inlormation is requested primarily for use by the applicant. The Florida <br />Highway Beautification Council will review the data and compare it to the project conceptual plans in order to <br />recommend funding for low maintenance projects. <br /> <br />SUMMARY OF APf:'LICANT'S ANTlCIPATEiJ/ANNUAL MAINTENANCE COSlS; <br /> <br />Water <br />Sprinkler/irrigation System <br />Landscaped Areas <br />Salety <br />I;,STIMATED TOTAL ANNUAkMl>,JNTENAN,cLCOST: <br /> <br />$ <br />$ <br />$ <br />$ <br /> <br />$ <br /> <br />0.00 <br />0.00 <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.