My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1110
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:12 AM
Creation date
7/24/2007 10:51:41 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1110
Date (mm/dd/yyyy)
06/21/2007
Description
Apprv Agmt w/ Marlin Engineering - Post Design Services (SR 826/SI Blvd)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />, 'If'"'' <br />E~~'" .. <br />attL'M!'-,c <br /> <br /> <br />L. . <br /> <br />March 26, 2007 <br /> <br />'Flectric.a[ Vesign J'Lssociates <br /> <br />Mr. Naldo Gonzalez, P,E, <br />Marlin Engineering, Inc, <br />2191 NW 97 Avenue <br />Miami, FL 33172 <br /> <br />Re: Sunny Isles Blvd Improvements <br />City of Surmy Isles, Florida <br /> <br />Dear Mr. Gonzalez; <br /> <br />We are pleased to submit our revised proposal for general services during construction for the <br />above project. Our services shall be for the electrical engineering services work shown on our <br />contract documents and shall consist ofthe following: <br /> <br />Task I - Prebid Meeting - EDA representative will be available to attend the prebid and <br />preconstruetion meetings to assist and to answer any question related to electrical drawings, <br /> <br />Task 2 - Shop Drawing Review - Review and approve (or take other appropriate action in respect <br />of) Shop Drawings and samples, the results of tests and inspeetions and other data whieh each <br />Contractor is required to submit, but only for conformance with the design concept of the Project <br />and compliance with the information given in the Contract Documents (but such review and <br />approval or other action shall not exceed to means, methods, sequences, techniques or procedures <br />of construction or to safety precautions and programs incident thereto); and receive and review <br />(for general eontent as required by the Specifications) maintenance and operating schedules and <br />instruction, guarantees, bonds and certificates of inspection which are to be assembled by <br />Contractor(s) is in aceordance with the Contract Documents, <br /> <br />Task 3 - Issue Clarifications - Issue all instructions of OWNER to Contractor(s); issue necessary <br />interpretations and clarifieations of the Contract Documents; have authority, as OWNER's <br />representative to require special inspection or testing of the work; act as initial interpreter of the <br />requirements of the Contract Documents and judge of the aceeptability of the work thereunder, <br />and make decisions on all claims of OWNER and Contractor(s) relating to the acceptability of <br />the work or the interpretation of the requirements of the Contract Documents pertaining to the <br />execution and progress of the work, The ENGINEER shall render all interpretations or decisions <br />in good faith and in aeeordance with the requirements of the Contract Documents, <br /> <br />Task 4 - Site Visits - Make visits to the site at periods appropriate to the various stages of <br />construction to observe, as an experienced and qualified professional, the progress and quality of <br />the executed work of Contractor(s) and to determine in general if such work is proceeding in <br />aceordance with the Contraet Documents, Prepare trip reports to document observations made <br />during these inspections, ENGINEER shall not be responsible for the means, methods, <br />teclmiques, sequences or procedures of construction selected by Contractor(s) or the safety <br /> <br />4733 West Atlantic Avenue, Suite 12-C . DeIray Beach, Florida 33445 <br />Telephone 561,819.5556 . Fax 561.819.5557 . www,goeda.com . M/WBE Certified <br />1~:mv~riO.@:'MZi8?"i1:'J-.:i!\SIV:h:--::; , '::<';"';':'~-':'~).~:E~~~:m~-i:-':!.~f?Hrl~lliYJfl{W~~~x.;1~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.