Laserfiche WebLink
<br />FEE ESTIMATE <br />North Bay Road Pedestrian I Bike and Emergency <br />Vehicle Bridge <br />(June 11, 2007) <br /> <br />A, BRIDGE AND WALLS <br /> <br />Classification <br /> <br />Hours <br /> <br />Hourly Rate <br /> <br />Fee <br /> <br />Project Manager (5%) <br />Chief Engineer (6%) <br />Senior Engineer (25%) <br />Designer (25%) <br />Senior CADD Technician (15%) <br />CADD Technician (24%) <br /> <br />162 <br />194 <br />809 <br />809 <br />485 <br />777 <br />3,236 <br /> <br />$145,00 <br />$150,00 <br />$135.00 <br />$100.00 <br />$73,00 <br />$60,00 <br /> <br />$23,490.00 <br />$29,100.00 <br />$109,215.00 <br />$80,900,00 <br />$35,405,00 <br />$46,620,00 <br />$324,730,00 <br /> <br />B, GEOMETRIC <br /> <br />Geometric Coordination (Between BHA and Marlin) <br /> <br />$10,000,00 <br /> <br />FEE ESTIMATE(A+B) <br /> <br />$334,730,001 <br /> <br />D, BOARDWALK <br /> <br />Design I Build Fee from Sun Belt Construction Services <br /> <br />$550,000,00 <br /> <br />jut.. <br />,"1\V'1 <br />~J€Wf1~;:I" <br /> <br />""".';.',; <br /> <br />::,,<'.::] :".,:},.;. ),"';';\~'.;.~:~'" <.:t., ';. >. <br /> <br />s :ltemplMrs _ 21sunnyislelfeeproposa I revised .xls <br /> <br />S\B <br />