My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1103
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:31:40 PM
Creation date
10/29/2007 11:00:34 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1103
Date (mm/dd/yyyy)
05/17/2007
Description
SR826 Project Bid Award & Agrmt w-Williams Paving (Bid# 07-03-02 $2,863,958.70)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is <br />A. The Owner may occupy or use any completed or partially completed <br />portion of the Work at any stage when such portion is designated by <br />separate agreement with the Contractor, provided such occupancy or use <br />is consented by the insurer, in accordance with Paragraph 5.06.A.5 and <br />as authorized by public authorities having jurisdiction over the Work. <br />Such partial occupancy or use may commence whether or not the portion <br />is substantially complete, provided Owner and Contractor have accepted <br />in writing the responsibilities assigned to each of them for payments, <br />Retainage, if any, security, maintenance, heat, utilities, damage to Work <br />and insurance, and have agreed in writing concerning the period for <br />correction of Work and commencement of warranties required by the <br />Contract Documents. When the Contractor considers a portion <br />substantially complete, the Contractor shall prepare and submit a <br />comprehensive list to the Engineer of the items to be completed or <br />corrected prior to final payment. The Failure to include an item on such <br />list does not alter the responsibility of the Contractor to complete all <br />Work in accordance with the Contract Documents. Consent of the <br />Contractor to partial occupancy or use shall not be unreasoanbaly <br />withheld. The stage of the progress of the Work shall be determined by <br />written agreement between the Owner and the Contractor, or if no <br />agreement is reached, by decision of the Engineer. <br />B. Immediately or prior to such partial occupancy or use, the Owner, <br />Contractor, and Engineer shall jointly inspect the area to be occupied or <br />the portion of the Work to be used in order to determine and record the <br />condition of the Work. <br />C. Unless otherwise agreed upon, partial occupancy or use of a portion or <br />portions of the Work shall not constitute acceptance of the Work not <br />complying with the Contract Documents." <br />In the first sentence of Paragraph 14.05.A.2., following the word "...Work... ", insert the <br />words "...or to place and install equipment... ". <br />At the end of Paragraph 14.07.A.2. after, ...with the Work. Insert, "(iv) acceptance by the <br />Owners and governing agencies <br />After the last sentence in Paragraph 14.04.13, insert the following: <br />"C. Once 1) the definitive certificate of completion has been issued to the <br />Owner and the Contractor and 2) once consent of the surety, if any, has <br />been obtained, the Owner shall make payment of Retainage applying to <br />such Work or designated portion thereof. Such payment shall be <br />adjusted for Work that is incomplete or not in accordance with the <br />requirements of the Contract Documents." <br />After the last sentence in the Paragraph 14.04.13, insert the following:." <br />March 2007 00800 -11 <br />1 <br />03- 4122.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.