Laserfiche WebLink
i <br />I <br />68 <br />Signal Pedestrian Assornbly Removal <br />2.00 <br />EA <br />SD • 00 <br />Jn • 00 <br />69 <br />Signal Pedestal Removal <br />1.00 <br />EA <br />2Gb • Od <br />ZC 0 OC <br />70 <br />Pole Removal (Shallow / Bolt on Attach) <br />1.00 <br />EA <br />L /fJ • Oc) <br />71 <br />Cntrl Assom Removo <br />1.00 <br />EA <br />345 OCR <br />72 <br />Defector Pedestrian Assembly Romovo <br />2,00 <br />EA <br />�Q.QO <br />73 <br />Conduit &Cabling Romovo <br />1.OD <br />PI <br />�•� <br />app, 0 <br />74 <br />Signal Equipment Misc. Remove <br />1 .00 <br />PI <br />/,,S�Q. 00 <br />�j �(�. � <br />76 <br />Sign Panels (F &I) (15 or <) <br />Z,Op <br />EA <br />�O <br />ZOD•OC <br />76 <br />Sign Panols (Relocate) (16 -100) <br />6.00 <br />E.00 <br />EA <br />/D �S • 00 <br />�/'\ ^, <br />77 <br />Sign Panels (Rem <br />(Remove) <br />EA <br />Subtotal of 0500 Signalizalion <br />V <br />Summary of 0600 Landscape / Peripheral <br />78 <br />Conduit (F &I Underground PVC SCH80) 2' <br />7800 <br />LF <br />7; <br />79 <br />Conduit (F &I Underground PVC SCH 80) 1 %2" <br />250 <br />LF <br />Il' S(0 <br />7Y. <br />80 <br />Conduit (F &I Underground PVC 80) 1' <br />5040 <br />LF <br />I u •7 S <br />r <br />81 <br />82 <br />Pull Box (F &I) <br />14 <br />EA <br />Conductors (F &I) (Insulated) (No. 2) <br />750 <br />LF <br />�/ 7J <br />3jbZ SC; <br />83 <br />Conductors (F &I) (Insulated) (No. 8) <br />17020 <br />LF <br />�• 4�35� <br />84 <br />Conductors (F&I) (Insulated) (No. 6) <br />48970 <br />LF <br />3.7,E <br />3(037•; <br />(p0, <br />85 <br />Service Rack Assembly <br />1 <br />EA <br />/ GU 00 <br />(fl i <br />86 <br />87 <br />Landscape Lighting Fixtures <br />Pavers, Architectural <br />1 10 <br />Eq <br />1.770 (ICJ <br />ICj,s DD. <br />(Sidewalk) <br />3,630.00 <br />SY <br />88 <br />Landscape Complete (Small Plants) <br />1.00 <br />LS <br />1631 0D <br />/ <br />89 <br />Landscape Complete (Largo Plants) <br />1.00 <br />LS <br />3V (� 2S-- 60 <br />3V; 2 <br />90 <br />Irrigation Systom <br />1.00 <br />Ls <br />3D S7ys DO <br />�� y yS., <br />91 <br />Trash Raceptacl© (F &I) (Pre - fabricated) <br />6,00 <br />EA <br />aQ70• DO <br />(� yZ0 •C <br />92 <br />benches (F &I) (pro - fabricated) <br />12.00 <br />EA <br />Subtotal of 0600 Lundscape / Peripheral <br />I� 3 X57 <br />VI <br />Contingency <br />1 <br />LS <br />100,ODO.00 <br />100,000.01 <br />TOTAL BASE BID <br />Otern I Thru VI) <br />Y10o dpe <br />r�Uu <br />ne ilttncf ell i� <br />-�1�hr �bo� <br />ib � <br />111.1��fl <br />m� � Vi�IL� Cc�w� Flu inc. <br />Written <br />m om'(! <br />i 2,CXo`7 <br />(Contractor) <br />([]ate) <br />rMarch <br />2007 00300 -4 <br />Addendurn ft4 <br />M NyJ <br />