Laserfiche WebLink
�l <br />B. All work and materials are subject to the approval of the Engineer. <br />C. All products shall be inspected by the Engineer for damage and chipped or marred finish. Contractor <br />shall replace any damaged items or product. <br />3.02 Installation <br />A. Trash Receptacles: <br />1. Freestanding: Place as shown on plans, per manufacturer's recommendations, after the completion <br />of the area where trash receptacles are to be placed. <br />2. Engineer will approve all trash receptacle locations. <br />B. Benches: <br />1. Freestanding: To be located after the completion of the area where benches are shown on plans or <br />as directed by the Engineer. <br />3.03 Clean Up <br />Upon completion of the work, contractor shall police his work areas ana remove all cartons, trash, and <br />construction debris off the site and legally dispose of. <br />3.04 Basis of Payment <br />A. The Contract unit price for each of the items installed and listed below shall be full compensation for <br />all labor and materials specified under this section. Payment shall be made under: <br />Item No. 721 -74 -1 Trash Receptacles (Prefabricated) - EA <br />Item No. 721 -75 -1 Benches (Prefabricated) - EA <br />February 2007 <br />01001 -2 <br />n <br />03- 4122.D. "' <br />