Laserfiche WebLink
F, <br />Rr," <br />F <br />M <br />f.- <br />b <br />�L <br />.;I <br />4I <br />9.5.2. In accordance with the indemnification provision contained in the General Conditions, <br />the CONTRACTOR agrees to indemnify and save harmless the CITY OF SUNNY ISLES BEACH, <br />and their agents and employees, from or on account of any injuries or damages received or <br />sustained by any person or person during or on account of any operations connected with the <br />construction of all Work; or by or in consequence of any negligence in connection with the <br />same; or by use of any improper materials or by or on account of any act or omission of the <br />said Contractor, subcontractor, agents, servants, or employees; and <br />9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the <br />construction, public liability insurance, by separate certificate, in an amount not less than <br />$1,000,000 for injuries, including willful death, to any one person and subject to those same <br />limits for each person, in an amount not less that $1,000,000 for damages as a result of each <br />occurrence and property damage insurance and in an amount not less than $1,000,000 for <br />damages on any one occurrence. Such policy shall specifically protect the CITY OF SUNNY <br />ISLES BEACH, AND their agents and employees, by making them an additional insured, and <br />shall not be modified or canceled without thirty (30) days written notice to the CITY OF <br />SUNNY ISLES BEACH. <br />9.5.4 Should the final completion and acceptance of the work herein embraced together <br />with any modification or additions be delayed beyond the time herein set because of lace of <br />performance by the Contract, it is understood and agreed that aside from any other liquidated <br />damage per day for such delay from such time until the work is completed and accepted as <br />herein provided, all costs of engineering and inspection on behalf of the Owner will be charged <br />to the contractor and deducted from any estimate or payment otherwise due and payable to <br />him from time to time. The costs of engineering and inspection which may be charged to the <br />Contractor by the Owner under this article shall be equal to the Engineer's charges to the <br />Owner. <br />IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in Five (5) parts. <br />One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of <br />the Contract Documents have been signed, initialed or identified by OWNER and CONTRACTOR or <br />identified by ENGINEER on their behalf. <br />This Agreement will be effective or % 20c�7(which is the Effective Date of the <br />Agreement). <br />ATTEST. Williams Paving Company, Inc. <br />Betty Jean Rodriguez — Secretary Ronnie Smith <br />[CORPORATE SEAL] <br />Address for giving notices <br />Vice President <br />By <br />[CORPORATE SEAL] <br />11300 NW South River Drive <br />Medley Fl. 33178 <br />License No. E2313 <br />Agent for service of process <br />00500 -7 <br />(If CONTRACTOR is a corporation, attached <br />evidence of authority to sign). e <br />03- 4122.D <br />