|
N�al'
<br />1?
<br />N
<br />�t
<br />h
<br />Ltv.
<br />Ifa
<br />�G
<br />n
<br />w
<br />EXHIBIT A
<br />State Road 826 / Sunny Isles Boulevard Project
<br />05/07
<br />Exhibit A -1
<br />03-4122.D
<br />, �y
<br />Bid
<br />Item
<br />Description
<br />Estimated
<br />Quanity
<br />Unit
<br />Unit
<br />Price
<br />Estimated
<br />Total
<br />A' ^
<br />L` �E i'" { �s�.: � � ;CL 4 ��. +� i1n \ d i
<br />t k �
<br />� I �" '3•ro
<br />{� S'�` ',� ��
<br />�.ti 'T'zi'*'t1 ....
<br />l
<br />Summary of 0200 Roadway
<br />1
<br />Mobilization
<br />1
<br />LS
<br />$140,000.00
<br />$140,000.00
<br />2
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$23,590.00
<br />$23,590.00
<br />3
<br />Commercial Material for Driveway Maintenance
<br />250
<br />CY
<br />$55.00
<br />$13,750.00
<br />4
<br />Traffic Control Officer
<br />30
<br />MH
<br />$88.00
<br />$2,640.00
<br />5
<br />Work Zone Signs
<br />1,332
<br />ED
<br />$0.35
<br />$466.20
<br />6
<br />Business Signs
<br />42
<br />EA
<br />$58.55
<br />$2,459.10
<br />7
<br />Barrier Wall (Temporary) (F & 1) (Concrete)
<br />984
<br />LF
<br />$58.55
<br />$57,613.20
<br />8
<br />Barrier Wall (Temporary) (Relocate) (Concrete)
<br />768
<br />LF
<br />$8.00
<br />$6,144.00
<br />9
<br />Barricade (Temporary) (Types I, II, DI, VP & DRUM)
<br />12,730
<br />ED
<br />$0.25
<br />$3,182.50
<br />10
<br />Barricade (Temporary) (Type III) (6')
<br />74
<br />ED
<br />$0.45
<br />$33.30
<br />11
<br />Panels Arrow Advance Warning
<br />132
<br />ED
<br />$11.75
<br />$1,551.00
<br />12
<br />High Intensity Flashing Lights, Temp -Type B
<br />676
<br />ED
<br />$0.45
<br />$304.20
<br />13
<br />Marker Pavt Reflective (Temporary)
<br />234
<br />EA
<br />$3.50
<br />$819.00
<br />14
<br />Lights (Temp -Barr. Wall Mount) (Type C Steady Burn)
<br />14
<br />ED
<br />$0.25
<br />$3.50
<br />15
<br />Impact Attenuator (Redirective Option) (Temporary)
<br />7
<br />LO
<br />$1,800.00
<br />$12,600.00
<br />16
<br />Changeable - Variable Message Sign (Temporary)
<br />112
<br />ED
<br />$36.00
<br />$4,032.00
<br />17
<br />Pavt Marking Removable (White /Black) (Skip)
<br />1,380
<br />LF
<br />$1.85
<br />$2,553.00
<br />18
<br />Pavt Marking Removable (White /Black) (Solid)
<br />6,580
<br />LF
<br />$1.85
<br />$12,173.00
<br />19
<br />Pavt Marking Removable (White /Black) (Other)
<br />657
<br />LF
<br />$3.45
<br />$2,266.65
<br />20
<br />Pavt Marking Removable (Yellow) (Solid)
<br />1,612
<br />LF
<br />$1.85
<br />$2,982.20
<br />21
<br />Rock Bags
<br />160
<br />EA
<br />$4.50
<br />$720.00
<br />22
<br />Clearing and Grubbing
<br />1
<br />LS
<br />$116,650.00
<br />$116,650.00
<br />23
<br />Milling Exist Asph Pavt (2" Avg Depth)
<br />10,523
<br />SY
<br />$4.25
<br />$44,722.75
<br />24
<br />Superpave Asph Conc (Traf C) (PG 76 -22)
<br />579
<br />TN
<br />$105.00
<br />$60,771.90
<br />25
<br />Asph Conc Friction Course (Inc Bit / Rubber) (FC -9.5)
<br />579
<br />TN
<br />$115.00
<br />$66,559.70
<br />26
<br />Conc Class I (Retaining Walls)
<br />7
<br />CY
<br />$920.00
<br />$6,440.00
<br />27
<br />Inlets (Curb) (Type P -2) ( <10')
<br />2
<br />EA
<br />$11,210.00
<br />$22,420.00
<br />28
<br />Inlets (Curb) (Type P -2) (> 10')
<br />1
<br />EA
<br />$11,195.00
<br />$11,195.00
<br />29
<br />Inlets (Curb) (Type P -6) (<10')
<br />1
<br />EA
<br />$11,170.00
<br />$11,170.00
<br />30
<br />Inlets (Curb) (Type P -6) (> 10')
<br />1
<br />EA
<br />$11,400.00
<br />$11,400.00
<br />31
<br />Manhole Adjustments
<br />8
<br />EA
<br />$310.00
<br />$2,480.00
<br />32
<br />Valve Boxes
<br />7
<br />EA
<br />$160.00
<br />$1,120.00
<br />33
<br />Curb and Gutter Concrete
<br />2,925
<br />LF
<br />$30.00
<br />$87,750.00
<br />34
<br />Sidewalk Concrete (4" Thick)
<br />127
<br />SY
<br />$33.50
<br />$4,254.50
<br />35
<br />Sidewalk Concrete (6" Thick)
<br />17
<br />SY
<br />$130.00
<br />$2,210.00
<br />36
<br />Sodding (Saint Augustine)
<br />384
<br />SY
<br />$3.75
<br />$1,440.00
<br />37
<br />Marking (Paint) Removal
<br />3,150
<br />SF
<br />$1.75
<br />$5,512.50
<br />Subtotal of 0200 Roadway
<br />$745,979.20
<br />ll.
<br />Summary of 0300 Signing
<br />38
<br />Sign Single Post
<br />41
<br />AS
<br />$275.001
<br />$11,275.00
<br />05/07
<br />Exhibit A -1
<br />03-4122.D
<br />, �y
<br />
|