Laserfiche WebLink
N�al' <br />1? <br />N <br />�t <br />h <br />Ltv. <br />Ifa <br />�G <br />n <br />w <br />EXHIBIT A <br />State Road 826 / Sunny Isles Boulevard Project <br />05/07 <br />Exhibit A -1 <br />03-4122.D <br />, �y <br />Bid <br />Item <br />Description <br />Estimated <br />Quanity <br />Unit <br />Unit <br />Price <br />Estimated <br />Total <br />A' ^ <br />L` �E i'" { �s�.: � � ;CL 4 ��. +� i1n \ d i <br />t k � <br />� I �" '3•ro <br />{� S'�` ',� �� <br />�.ti 'T'zi'*'t1 .... <br />l <br />Summary of 0200 Roadway <br />1 <br />Mobilization <br />1 <br />LS <br />$140,000.00 <br />$140,000.00 <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />$23,590.00 <br />$23,590.00 <br />3 <br />Commercial Material for Driveway Maintenance <br />250 <br />CY <br />$55.00 <br />$13,750.00 <br />4 <br />Traffic Control Officer <br />30 <br />MH <br />$88.00 <br />$2,640.00 <br />5 <br />Work Zone Signs <br />1,332 <br />ED <br />$0.35 <br />$466.20 <br />6 <br />Business Signs <br />42 <br />EA <br />$58.55 <br />$2,459.10 <br />7 <br />Barrier Wall (Temporary) (F & 1) (Concrete) <br />984 <br />LF <br />$58.55 <br />$57,613.20 <br />8 <br />Barrier Wall (Temporary) (Relocate) (Concrete) <br />768 <br />LF <br />$8.00 <br />$6,144.00 <br />9 <br />Barricade (Temporary) (Types I, II, DI, VP & DRUM) <br />12,730 <br />ED <br />$0.25 <br />$3,182.50 <br />10 <br />Barricade (Temporary) (Type III) (6') <br />74 <br />ED <br />$0.45 <br />$33.30 <br />11 <br />Panels Arrow Advance Warning <br />132 <br />ED <br />$11.75 <br />$1,551.00 <br />12 <br />High Intensity Flashing Lights, Temp -Type B <br />676 <br />ED <br />$0.45 <br />$304.20 <br />13 <br />Marker Pavt Reflective (Temporary) <br />234 <br />EA <br />$3.50 <br />$819.00 <br />14 <br />Lights (Temp -Barr. Wall Mount) (Type C Steady Burn) <br />14 <br />ED <br />$0.25 <br />$3.50 <br />15 <br />Impact Attenuator (Redirective Option) (Temporary) <br />7 <br />LO <br />$1,800.00 <br />$12,600.00 <br />16 <br />Changeable - Variable Message Sign (Temporary) <br />112 <br />ED <br />$36.00 <br />$4,032.00 <br />17 <br />Pavt Marking Removable (White /Black) (Skip) <br />1,380 <br />LF <br />$1.85 <br />$2,553.00 <br />18 <br />Pavt Marking Removable (White /Black) (Solid) <br />6,580 <br />LF <br />$1.85 <br />$12,173.00 <br />19 <br />Pavt Marking Removable (White /Black) (Other) <br />657 <br />LF <br />$3.45 <br />$2,266.65 <br />20 <br />Pavt Marking Removable (Yellow) (Solid) <br />1,612 <br />LF <br />$1.85 <br />$2,982.20 <br />21 <br />Rock Bags <br />160 <br />EA <br />$4.50 <br />$720.00 <br />22 <br />Clearing and Grubbing <br />1 <br />LS <br />$116,650.00 <br />$116,650.00 <br />23 <br />Milling Exist Asph Pavt (2" Avg Depth) <br />10,523 <br />SY <br />$4.25 <br />$44,722.75 <br />24 <br />Superpave Asph Conc (Traf C) (PG 76 -22) <br />579 <br />TN <br />$105.00 <br />$60,771.90 <br />25 <br />Asph Conc Friction Course (Inc Bit / Rubber) (FC -9.5) <br />579 <br />TN <br />$115.00 <br />$66,559.70 <br />26 <br />Conc Class I (Retaining Walls) <br />7 <br />CY <br />$920.00 <br />$6,440.00 <br />27 <br />Inlets (Curb) (Type P -2) ( <10') <br />2 <br />EA <br />$11,210.00 <br />$22,420.00 <br />28 <br />Inlets (Curb) (Type P -2) (> 10') <br />1 <br />EA <br />$11,195.00 <br />$11,195.00 <br />29 <br />Inlets (Curb) (Type P -6) (<10') <br />1 <br />EA <br />$11,170.00 <br />$11,170.00 <br />30 <br />Inlets (Curb) (Type P -6) (> 10') <br />1 <br />EA <br />$11,400.00 <br />$11,400.00 <br />31 <br />Manhole Adjustments <br />8 <br />EA <br />$310.00 <br />$2,480.00 <br />32 <br />Valve Boxes <br />7 <br />EA <br />$160.00 <br />$1,120.00 <br />33 <br />Curb and Gutter Concrete <br />2,925 <br />LF <br />$30.00 <br />$87,750.00 <br />34 <br />Sidewalk Concrete (4" Thick) <br />127 <br />SY <br />$33.50 <br />$4,254.50 <br />35 <br />Sidewalk Concrete (6" Thick) <br />17 <br />SY <br />$130.00 <br />$2,210.00 <br />36 <br />Sodding (Saint Augustine) <br />384 <br />SY <br />$3.75 <br />$1,440.00 <br />37 <br />Marking (Paint) Removal <br />3,150 <br />SF <br />$1.75 <br />$5,512.50 <br />Subtotal of 0200 Roadway <br />$745,979.20 <br />ll. <br />Summary of 0300 Signing <br />38 <br />Sign Single Post <br />41 <br />AS <br />$275.001 <br />$11,275.00 <br />05/07 <br />Exhibit A -1 <br />03-4122.D <br />, �y <br />