My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1180
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:21 AM
Creation date
11/20/2007 1:31:37 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1180
Date (mm/dd/yyyy)
11/15/2007
Description
SR826/SIBlvd Post Design Add Svcs Agrmt w-Marlin Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TO: <br />VIA: <br />FROM: <br /> <br />DATE: <br />REGARDING: <br /> <br />City of Sunny Isles Beach <br />18070 Collins A. ven ue <br />Sunny Isles Beach, Florida 33160 <br /> <br />Clt)' CommisJiol1 <br />Nonnan s. Edelcup, AI,IY"" <br />Lewis J. Thaler, 1/'1"' Ald/O,. <br />Roslyn Brczin, (.ommi.(rioncr <br />Gerry Goodman, (.(J/Jlllliu'inm:r <br />Danny Iglesias, (."omm/l'.riont'r <br /> <br />(305) 947 -0606 City Ilall <br />(305)949-3113 hi, <br />(30S) 947 -21 SO BuilJing 1)l"['artml"tH <br />(305) 947-5107 I'a' <br /> <br />A. John Szerlag, City M"n<<~n <br />Hans OUinot, (ify /llloT1lej' <br />Jane A. Hines, City Uo* <br /> <br />Honorable Mayor and City Commission <br /> <br />A. John Szerlag, City Manager <br /> <br />Jorge Vera, Assistant City Manager <br />Rick Conner, Director of Public Works <br /> <br />November 15, 2007 <br /> <br />Approval of an addendum to the contract with Marlin Engineering for <br />Subsurface Utility Exploration (SUE) on Sunny Isles Boulevard <br /> <br />RECOMMENDATION <br /> <br />We recommend that the City Commission approve an addendum to the contract with Marlin <br />Engineering for the design of improvements to Sunny Isles Boulevard, in an amount not to exceed <br />$46,973.85 for subsurface utility exploration to allow FP&L to move overhead electric lines to <br />underground locations. <br /> <br />REASONS <br /> <br />We have been working with Florida Power & Light for some time now to move their overhead <br />services to underground locations on Sunny Isles Boulevard. They have recently committed to the <br />project, and the timing is perfect considering we will soon be completely overlaying this segment of <br />the street. As part of this process, an SUE (the location of all other underground utilities) is needed. <br />We can wait for them to do it (one to two years) or we can do it for them and move this project to <br />completion. We are asking your approval to do so. <br /> <br />ADDmONAL INFORMATION <br /> <br />We did complete a plan of which this is part. <br />We already have the right to use the property. <br />The total cost of the project is estimated to be less than $50,000. <br />There will be no annual operation and maintenance costs. <br />The expected time for completion of the project is the Winter of 2007-2008. <br />Funding is available in Account Number 20-600-5622. <br /> <br />l'unJing <br />available: <br /> <br />I :manCl' l )cpartlnL'tlt <br /> <br /> <br />(:1 JIllnlissil 1Il I\J l.cting I )atc: <br /> <br />.\gmd:l Item No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.