My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1180
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:42:21 AM
Creation date
11/20/2007 1:31:37 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1180
Date (mm/dd/yyyy)
11/15/2007
Description
SR826/SIBlvd Post Design Add Svcs Agrmt w-Marlin Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />i) <br />II <br />..i....' <br /> <br />October 1 st, 2007 <br /> <br />Rick Conner, P.E. <br />Engineering & Public Works Director <br />City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Fl33160 <br /> <br />Re: Proposal for Professional Engineering Services for <br />Post Design for SR 826 EB/Sunny Isles Blvd Sidewalk Enhancement Project <br />From Bridge to SR AlA/Collins Avenue <br />Subsurface Utility Exploration & Existing Water Main Replacement <br />Project No. 03-4122.0 <br /> <br />Dear Mr. Conner: <br /> <br />We are pleased to provide this proposal for providing post design services for the subject construction <br />project as requested by the City. Enclosed are the Scope of Services and Fee Estimate for Marlin <br />Engineering, Inc. for Subsurface Utility Exploration and the Existing Water Main Replacement on the South <br />S ide of the Proj ect. <br /> <br />Below is an outline of scope, contract duration, subconsultants, and total fee proposal for this contract. <br /> <br />1. PURPOSE <br /> <br />Marlin Engineering Inc. will provide Post Design Services during construction for the State Road 826 <br />Eastbound/Sunny Isles Boulevard Improvement Sidewalk Enhancement Project, Project No. 03-4122.D in <br />the City of Sunny Isles Beach, Miami-Dade County, Florida as outlined below. <br /> <br />2. SCOPE OF SERVICES <br /> <br />· Perform Subsurface Utility Exploration and Reports <br />· Replacement of the Existing Water Main along the South Side of the Project <br /> <br />For a detail of the staffhours for each task and activity, see the attached staff hour and fee estimate. <br /> <br />3. CONTRACT DURATION <br /> <br />The anticipated contract duration for these services and the basis for the attached fee estimate is 30 days. <br /> <br />4. FEE PROPOSAL <br /> <br />The total fee for the post design services is a unit hourly rate not to exceed the amount ofFortv Six <br />Thousand Nine Hundred Seventy Three dollars, and Eighty Five cents, $46,973.85. This fee will be invoiced <br />on a monthly basis. Additional services not included in the aforementioned scope of services and/or work <br />beyond the CONTRACT DURATION for required post design will require a separate Proposal. <br /> <br />...lfl1'~!;~~@l)'j).fl'!)dJffiJ/];)~. 'frrr~ ~o~~ . 0"'~<<:fI ~~o:>>~~. [)=IJO~~~o~/];) <br />..._ . .1Mll1miJ~~ .~~~/];) · '1117~$Ilfr. <<;:@/];)$arr~@i'D 1Ml~[/j)m:;>O'W. ~~@) o/];)\ll~!lil@/];). ~~~11'1J@ <br />~ ;. <br />2191 NW 97 Avenue M'a",', Flor'da 33172-2313 Tel. (305J 477-7575 Fax (305J 477-7590 .." I <br />-.::.;'/ :' <br /> <br />WWW..IlIllIQvflii=lI\:Bliil1lleei7ul1ll!lJ.c:c <br /> <br />ATTACHMENT "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.