My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2007-1150
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2007
>
Reso 2007-1150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 1:04:08 PM
Creation date
1/28/2008 5:50:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2007-1150
Date (mm/dd/yyyy)
09/20/2007
Description
Agmt w/Tenex for 172 Street Roadway Improv($1,066,884)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LF� <br />�i <br />IJ <br />v <br />r <br />�II <br />r. <br />D <br />n <br />v <br />r <br />L <br />I <br />SECTION 01046 <br />MODIFICATIONS TO EXISTING STRUCTURES, PIPING AND EQUIPMENT <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Furnish all labor, materials, equipment and incidentals required to modify, alter <br />and convert existing structures as shown or specified and as required for the <br />installation of new mechanical equipment, piping and appurtenances. Work shall <br />be performed within the requirements of Special Project Procedures in Section <br />01030 and required Construction Scheduling in Section 01310. Existing piping <br />and equipment shall be removed and dismantled as necessary for the <br />performance of structural alterations in accordance with the requirements herein <br />specified. <br />1.02 RELATED WORK <br />A. Section 01045: Cutting and Patching <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.01 GENERAL <br />A. The Contractor shall cut, repair, reuse, excavate, demolish or otherwise remove <br />parts of the existing structures or appurtenances, as indicated on the Contract <br />Drawings, herein specified, or necessary to permit completion of the work under <br />this Contract. <br />B. Blasting with explosives will not be permitted to complete any work under this <br />Contract. Care shall be taken not to damage any part of existing buildings, <br />foundations and exterior structures both below and above ground. <br />C. No existing structure, equipment, or appurtenance shall be shifted, cut, removed, <br />or otherwise altered except with the express approval of and to the extent <br />approved by the Engineer. <br />D. Materials and equipment removed in the course of making alterations and <br />additions shall remain the property of the Owner, except that items not <br />salvageable, as determined by the Engineer and the Owner shall become the <br />property of the Contractor to be disposed of by him off the site of the work at his <br />own place of disposal. <br />E. All work of altering existing structures shall be done at such time and in such <br />manner as will comply with the approved time schedule. So far as possible <br />before any part of the work is started, all tools, equipment, and materials shall be <br />06/07 01046 -1 03 -4197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.