Laserfiche WebLink
Y; <br />Ee <br />C. Density tests for limerock base at the rate of three tests per day on each course <br />of completed compacted base. <br />D. Density tests for roadway crossings at the rate of one test per lane per lift of <br />compacted material, beginning one foot above the normal water table. <br />E. If in the opinion of the Engineer, suitable compaction has not been achieved <br />around structures, density tests may be required. <br />F. Concrete compressive strength at the rate of three cylinders per the lesser of 50 <br />cubic yards or per day. <br />G. Should the above test results indicate deficiencies, the Engineer may order <br />additional tests at the Contractor's expense, and all reworked areas shall be <br />retested at the Contractor's expense. <br />H. Testing in the County right -of -way shall meet the requirements of Dade County's <br />"Minimum Standards ". <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION <br />06/07 01410 -3 <br />03 -4197 <br />